800mw supercritical coal fired power plant 2.pdfVIP

  • 23
  • 0
  • 约2.83万字
  • 约 22页
  • 2018-03-28 发布于河南
  • 举报
800mw supercritical coal fired power plant 2.pdf

CONTENTS CONTENTS To Our Customers To Our Customers Plant Design Overview Plant Design Overview Intelligent Design Tool Intelligent Design Tool Advanced Plant Design Advanced Plant Design Project Experience Project Experience Project Award Project Award We are trying to harmonize “the human the engineering”, and also provide all your needs in the power industry. The customer’s satisfaction is our utmost goal. To Our Customers To Our Customers To Our Customers Korea Power Engineering Company, Services Provided Inc. KOPEC has grown to become one ● Feasibility Studies of the largest Architect / Engineering ● Project Planning Companies in Korea. Certified by ● Basic/Detail Design Engineering international authorization agencies, ● Construction Management ASME, and to the requirements of ISO ● Plant Testing Start-up 9001 and 14001, our power plants are ● Quality Assurance Quality Control state-of-the-art. Services ● Procurement Services Since its foundation in 1975, KOPEC has ● Plant Improvement and Life always been committed to provide our Extension customers with a myriad of optimized ● Training Services for Engineers and power plants. Through our participation Operators ● Computer Application for System in domestic power projects, we can Engineering and Records offer you the confidence of our proven Management experience. ● Simulator Engineering Model Manufacture Our goal is to provide technically ● Environmental Services advanced and cost-effective power ● Electric Construction Works plant design and services based on the ● Civil and Architectural Construction experience and expertise accumulated Construction Engineering Services through our participation in various ● Construction Supervision Services power plant projects. ● Research Development 1 Plant Design Ov

文档评论(0)

1亿VIP精品文档

相关文档