- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Efficient dispatching rules for dynamic job shop scheduling》.pdf
Int J Adv Manuf Technol (2004) 24: 70–75
DOI 10.1007/s00170-002-1534-5
ORIGINAL ARTICLE
P. D. D. Dominic Æ S. Kaliyamoorthy
M. Saravana Kumar
Efficient dispatching rules for dynamic job shop scheduling
Received: 9 July 2002 / Accepted: 16 September 2002 / Published online: 11 May 2004
Springer-Verlag London Limited 2004
Abstract This study attempts to provide efficient dis- task allocation as well as the determination of process
patching rules for dynamic job shop scheduling by commencement and completion times i.e., time-tabling
combining different dispatching rules. A dispatching rule [2]. Sequencing problems occur whenever there is a
is used to select the next job to be processed from a set of choice concerning the order in which a group of tasks
jobs awaiting service. A job shop will be treated as dy- can be performed. The shop supervisor or scheduler can
namic, when conditions such as continuously arriving deal with sequencing problems in a variety of ways. The
new jobs and deviations from current schedule need to simplest approach is to ignore the problem and accom-
be accommodated, and a job shop should be treated as plish the tasks in any random order. The most
an integrated part of a manufacturing system. The dis- frequently used approach is to schedule heuristically
cussion includes a simulation technique which uses according to predetermined ‘‘rules of thumb’’. In certain
ARENA 4.0. software to simulate the dynamic model of cases, scientifically derived scheduling procedures can be
a job shop under various rules and performance mea- used to optimise the scheduling objectives.
sures . Results of the simulation show that, for most of Measures considered in this paper include [1]:
t
您可能关注的文档
- 《1993 A practical approach to job-shop scheduling problems》.pdf
- 《1993 An efficient dynamic dispatching rule for scheduling in a job shop》.pdf
- 《1994 A branch and bound algorithm for the job-shop scheduling problem》.pdf
- 《1994 Adjustments of heads and tails for the job-shop problem》.pdf
- 《1994 The job-shop problem and immediate selection》.pdf
- 《1995 A descent proximal level bundle method for convex nondifferentiable optimization》.pdf
- 《1995 A more efficient Lagrangian relaxation approach to job-shop scheduling problems》.pdf
- 《1995 A reinforcement Learning approach to job-shop scheduling》.pdf
- 《1995 High-Performance Job-Shop Scheduling With A Time-Delay TD(lambda) Network》.pdf
- 《1995 Insertion techniques for the heuristic solution of the job shop problem》.pdf
- 吉安县公开招聘专职文明实践员笔试备考试题及答案解析.docx
- 2025重庆枫叶国际学校招聘教师笔试备考试题及答案解析.docx
- 游机队电玩自制联网教程-tplink.pdf
- 2025重庆新华出版集团招聘1人笔试模拟试题及答案解析.docx
- 2025宜宾高新丽雅城市产业发展有限公司公开招聘笔试模拟试题及答案解析.docx
- 2025云南保山市龙陵县勐糯镇人民政府招聘合同制专职消防员1人笔试模拟试题及答案解析.docx
- 11.1生活中常见的盐 九年级化学人教版下册.pptx
- 6.1法律保护下的婚姻 高二政治《法律与生活》课件(统编版选择性必修2)(新版).pptx
- 文昌市中小学教师校园招聘29人笔试模拟试题及答案解析.docx
- 10.1.5 常见的酸和碱(第5课时)课件-九年级化学人教版下册.pptx
最近下载
- 五年级上册数学试题-期末测试卷人教版(含答案).docx VIP
- 某智慧交通与智慧城管PPP项目建设项目智慧城市下阶段发展建议书.doc VIP
- 智慧城市建设(智慧交通与智慧城管)PPP项目-技术标书.docx VIP
- 湖北省“腾云”联盟2024-2025学年高三上学期8月联考物理试卷含答案.pdf
- 广州数控GSK980TDc车床CNC数控系统使用手册.pdf
- 高中高考数学所有二级结论《完整版》.docx VIP
- 湖北省腾云联盟2024-2025学年高三上学期12月联考物理试卷含答案.docx VIP
- 药液外渗的应急预案及处理PPT.pptx VIP
- 智能交通系统标准体系结构.doc VIP
- 平安产险内蒙古自治区商业性奶牛养殖保险条款.docx VIP
文档评论(0)