网站大量收购独家精品文档,联系QQ:2885784924

《Translation of natral gas project gas pressure regulator technical specification》.doc

《Translation of natral gas project gas pressure regulator technical specification》.doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《Translation of natral gas project gas pressure regulator technical specification》.doc

3.1 General Principles 1) Pressure Regulator system is composed of SSV, Monitor Pressure Regulator, working pressure regulator made by safety regulator, monitor regulator connected from upstream to downstream. The range of supply, please see the equipment, instrument, interface cable and explosion protection box in diagram of pressure regulator system. SSV, Monitor pressure regulator and Working pressure regulator are all independent. In the normal condition, the SSV and the Monitor Pressure regulator are in full open position. The Working Pressure Regulator is charge of controlling the pressure in downstream. When there is some failure in Working Pressure Regulator, Monitor Pressure Regulator gets into the work automatically for maintaining the supply pressure in downstream in a safe range. If Monitor Pressure Regulator is also failure and can not control the downstream pressure, the SSV will cut the supply of this system automatically for maintaining the safety of downstream pipes and equipments. According the working condition of this project, all the pressure equipments and pressure level of pressure regulator system should apply to the requirement of ≥1.6MPa.The exit pressure level of all kinds valves should equal to the entrance pressure level, and the pressure level of pressure control valve’s take pressure parts and lead pressure parts in downstream also should be equaled to the upstream pressure levels. 2) For ensuring every equipment is working safety, the control accuracy of pressure regulator system and the right position of pressure signal pickup, system should connect, fit tightly avoid the influence of the extraneous factor of assembling, transportation, installing, debugging etc. The pressure regulator system supplied by supplier should be installed according to the order of upstream, downstream control equipment mentioned above. And the equipment should be a completed, impact one, connected each valve together, and tested the pressure, debugged sin

文档评论(0)

ghfa + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档