《范布伦办公楼项目的BIM应用(AIA 2016 BIM获奖作品)》.pdfVIP

《范布伦办公楼项目的BIM应用(AIA 2016 BIM获奖作品)》.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《范布伦办公楼项目的BIM应用(AIA 2016 BIM获奖作品)》.pdf

Project overview Technology Transforms Existing Building Into 21st Century Workspace The Northwestern Mutual - Van Buren Office Building project included the complete remodel of a seven-story, 162,087-square-foot existing office building. The interior of the building was completely demolished to keep only the structure and enclosure. New mechanical, electrical, and plumbing systems, windows, insulation, and interiors were constructed. The new office includes 650 work stations designed for the 21st century work environment. Private offices, open collaborative spaces, enclaves and conference rooms, copy/mail room, amenities room, and modernized restrooms are located on each floor. In addition, the building houses the Mutual Health Center with seven exam rooms, a procedure room, physical therapy, and a themed children’s health care exam room. The project is seeking LEED Certification. As a challenging project, the team utilized Building Information Modeling (BIM) technologies to add value to the project and ensure success. Specifically, BIM identified existing conditions, allowed the owner to visualize design components for decision making, streamlined prefabrication and installation efforts, and created opportunities for long-term building maintenance. BIM also contributed to improvements in quality, safety, schedule, and budget. The transformation began in October 2012 and was substantially complete in August 2013, nearly a month ahead of schedule. The project was also nearly $1.0 million under budget. AIA 2014 TAP BIM AwA rds: CAT egory B norT hwesT ern MuT uA l VA n Buren offICe BuIldIng

文档评论(0)

ghfa + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档