建北煤矿4-2101综放工作面矿压规律及研究.pdfVIP

建北煤矿4-2101综放工作面矿压规律及研究.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
优秀硕士毕业论文,完美PDF格式,可在线免费浏览全文和下载,支持复制编辑,可为大学生本专业本院系本科专科大专和研究生学士硕士相关类学生提供毕业论文范文范例指导,也可为要代写发表职称论文提供参考!!!

万方数据 -2 Subject :Research on Laws of Underground Pressure in 4 101 Fully-mechanized Caving Face of Jian Bei Coal Mine Specialty :Mining Engineering Name :Zhang Bo (Signature) Instructor :Fan gongqin (Signature) ABSTRACT Jianbei coal mine is the new coal which is located in the northern of Huangling Jianzhuang mining area that is in Yanan city Shaanxi Province. The main coal seam is 4-2 coal seam, thickness of coal seam is 5~10m, the average thickness is 7.6m, buried depth is 473~ 570m, the elevation is 827~920m, the angle is 2~5°, design capacity is 2100000t/a. This paper uses the Jianbei coal mines geological conditions as the background, on the basis of mine pressure observation data, using the method of computer numerical simulation and theoretical analysis to 4-2 101 fully mechanized face mine pressure regularity are studied. It studied that the basic roof ’s initial pressure pace of 4-2 101 workingface is 25m and the periodic pressure pace is 9.6~15.7m, the average pace is 12.5m. Basic roof support on the dynamic load coefficient is 1.2~1.7, on average is 1.5, each stage to compressive strength is not high, there are obvious periodic pressure and roof management difficulty of medium. Constriction of entry was beyond workingface about 35m, the range of roof and floor closer faster at 6~15m, small amounts of cumulative nearer, the maximum of 30.47mm, the supporting method is safe. Stoping less disturbance on the roadway, the peak of abu

文档评论(0)

ygeorcgdw + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档