- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SECTION02600-1-theSchoolDistrictofPalmBeachCounty.doc
SECTION 02730 (33 30 00)
SANITARY SEWERAGE UTILITIES
PART 1 GENERAL
SECTION INCLUDES:
Sanitary sewer pipes fittings.
Excavation for pipe trenches.
Manholes, covers, and grease traps.
Requirements for documentation.
REFERENCES
ANSI/AWWA C110, American National Standard for Ductile-Iron and Gray-Iron Fittings, 3 in. through 48 in. (75 mm through 1200 mm), for Water and Other Liquids
ANSI/AWWA C151/A21.51, American National Standard for Ductile-Iron Pipe, Centrifugally Cast, for Water
ANSI/AWWA C900, Polyvinyl Chloride (PVC) Pressure Pipe, 4 in. through 12 in., for Water Distribution
ANSI/AWWA C905, Polyvinyl Chloride (PVC) Water Transmission Pipe, Nominal Diameters 14 In. through 36 In
ASTM A48, Standard Specification for Gray Iron Castings
ASTM C62, Standard Specification for Building Brick (Solid Masonry Units Made From Clay or Shale
ASTM D1782. Standard Test Method for Operating Performance of Particulate Cation-Exchane Materials
ASTM D1784, Standard Specification for Rigid Poly(Vinyl Chloride) (PVC) Compounds and Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds
ASTM D2321, Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications
ASTM D3034, Standard Specification for Type PSM Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings
EXISTING UTILITIES
The contractor shall obtain a Sunshine State One Call Center Certification number at least 48 hours prior to beginning any excavation. (Call Sunshine 1-800-432-4770)
Prior to beginning construction, the Contractor shall verify the size, location, elevation, and material of all existing utilities within the area of construction by use of record drawings and/or electronic locating devices.
Existing utility locations shown on the plans are approximate and based on available records.
The Contractor is responsible for verifying all utilities, and notifying the Architect of conflicts and variations.
The Contractor is responsible for damage to any existing utilities for
您可能关注的文档
- sample1.ppt-workshoptechnology.ppt
- SampleChapter-CrazyLove.PDF
- SampleHealthReimbursementArrangement-TheBoardof.doc
- SampleP1607.doc
- SamplePagesWilliamE.BrysonHeatTreatmentMaster.PDF
- SamplePaperLetters(doc,748kB)-Springer.doc
- SampleTitle,inGillSans-SavetheChildren.ppt
- SamplingDistributionoftheMeanSEMRCode-Walker.doc
- SAN(G)33ManagingtheCausesofWorkRelatedStressin.doc
- SandboxLab.doc
- 专题04 天气与气候(期末真题汇编,广东专用)(解析版).docx
- 专题04 中国的经济发展(百题精选)(期末真题汇编)(原卷版).docx
- 专题05 建设美丽中国(专项训练)(原卷版).docx
- 专题05 建设美丽中国(专项训练)(解析版).docx
- 专题05 居民与文化 发展与合作(百题精选)(期末真题汇编)(解析版).docx
- 2024年下半年教师资格考试中学《教育知识与能力》真题(含答案和解析).docx
- 专题05 居民与文化 发展与合作(百题精选)(期末真题汇编)(原卷版).docx
- 专题05 居民与文化 发展与合作(期末真题汇编,广东专用)(解析版).docx
- 专题05 居民与文化 发展与合作(期末真题汇编,广东专用)(原卷版).docx
- 统编版七年级语文上册课件《雨的四季》.pptx
原创力文档


文档评论(0)