Section316200-DRIVENPILES-OfficeofConstruction.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Section316200-DRIVENPILES-OfficeofConstruction.doc

Modifications/Changes in this update Department of Veterans Affairs ( Office of Construction Facilities Management DATE SUBMITTED: 10/01/12 DESCRIPTION OF DOCUMENT: (previous section title, number and date) 31 62 00 Driven Piles (10-06M) CHANGES MADE: Modifications include updating references, and the following: Added requirement to include pile load tests Added tolerance requirements for top of pile elevation and battered piles. Added requirement for a pile load test work plan Added requirement for identification for type of treatment for timber piles SECTION 31 62 00 DRIVEN PILES SPEC WRITER NOTE: Delete between //// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs. PART 1 GENERAL 1.1 DESCRIPTION This section specifies materials and installation required for the construction of impact driven foundation piles. 1.2 RELATED WORK A. Materials testing and inspection during construction: Section 01 45 29, TESTING LABORATORY SERVICES. B. Concrete, including materials, reinforcing steel, and mixes: Section 03?30?00, CAST-IN-PLACE CONCRETE. C. Timber: Section 06 10 00, ROUGH CARPENTRY. D. Steel: Section 05 12 00, STRUCTURAL STEEL FRAMING. E. Subsurface investigation: Section 01 00 00, GENERAL REQUIREMENTS, Article, PHYSICAL DATA. 1.3 CONTRACT BASIS A. Contract price for piles will be based upon length of piles shown and number of pile load tests indicated in the Contract Documents. Length of piles will be measured from tip to point of cutoff. 1. Adjustment of contract price shall be based upon total length of piles placed and not on length of individual piles placed. When total length of completed piles is greater or less than length shown, contract price adjustment will be made in accordance with Articles, DIFFERING SITE CONDITIONS, CHANGES and CHANGES-SUPPLEMENT of the GENERAL CONDITIONS as applicable. 2. No payment will be made for withdrawn, broken or rejected piles, piles o

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8010045112000002

1亿VIP精品文档

相关文档