OntarioMOT-PrecastSlabRepairSP-Apr06.doc.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
OntarioMOT-PrecastSlabRepairSP-Apr06.doc.doc

PRECAST CONCRETE PAVEMENT SLAB REPAIRS Item No. Non Standard Special Provision April, 2006 1.0 SCOPE This special provision details the requirements for precast concrete pavement slab repairs on Highway 427. The Contractor shall carry out precast concrete pavement slab repairs at the locations identified in the Contract Documents. The work shall include both continuous and intermittent slab repairs. The existing pavement consists of approximately 230 mm (range 200-255 mm) of unreinforced concrete pavement over 150 mm cement treated base (CTB). The condition of the CTB ranges from excellent to disintegrating. In some areas, the concrete pavement has been removed and repaired with hot mix asphalt. Acceptable methods of repair are the Fort Miller Super-Slab( Method and the Michigan Method, as modified by the requirements of this special provision. In the Fort Miller Method, the work shall consist of fabricating precast concrete pavement slab repairs (Super-Slab(), sawcutting and removal of existing concrete pavement, fine grading base material, insertion of dowel bars and tie bars, placement of slabs, installation of proprietary concrete repair material in inverted dovetail slots, installation of bedding grout under the slabs, and sealing of joints, all in accordance with this special provision. For information on the Fort Miller Super-Slab( Method, contact: Peter J. Smith, P.E. The Fort Miller Co. Inc. P.O. Box 98 Schuylerville, NY, USA 12871 Ph (518) 695-5000 In the Michigan Method, the work shall consist of fabricating precast concrete pavement slab repairs with dowel bars, sawcutting and removal of existing concrete pavement, placement of flowable fill levelling material, constructing dowel bars slots, placement of slabs, installation of proprietary concrete repair material in dowel bar slots, and sealing of joints, all in accordance with this special provision

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档