BLEEDERPLAN-VirginiaDepartmentofMines,Minerals.PDFVIP

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
BLEEDERPLAN-VirginiaDepartmentofMines,Minerals.PDF

OVERCAST and BOOMHOLE BLASTING PLAN Company Name Mine Name or Number Date DM Mine Index Number The following procedures, as required by §45.1-161.129.C of the Coal Mine Safety Laws of Virginia, will be utilized for overcast, belt trench, and/or mine floor excavation. A non- permissible shot firing unit will be utilized to shoot up to 150 boreholes at a time using delay detonators. 1. All sections of the Coal Mine Safety Laws of Virginia , pertaining to explosives and blasting, will be complied with. 2. All blasting activities will be conducted by a certified shot-firer or by persons working in the presence of and under the direct supervision of a certified shot-firer. 3. No blasting will be conducted within 500 feet of any active gob or sealed area. 4. A minimum of 9,000 cubic feet per minute of air flow will be maintained through the blast area at all times. 5. Explosives and detonators will only be transported from the storage magazine to the blast site in separate powder bags designated for that purpose. 6. Rock dust will be applied to the mine roof, ribs, and floor in the blast area and for a distance of 100 feet in all approaches to the blast area. 7. A proper test for methane will be made in the blast area immediately before loading or charging of holes. 8. All electrical equipment at the blast area will be removed or de-energized at the power source before any holes are loaded or charged and will be kept out of the area or de-energized until the shots are fired. 9. All approaches to the blast area will be blocked off to prevent entry prior to loading or charging the holes. 10. Detonators will be properly identified and stored separately

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档