LowVoltageGroundProtectPlusGuideSpecification(93KB).docVIP

LowVoltageGroundProtectPlusGuideSpecification(93KB).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
General The intent of this specification is to have the manufacturer furnish the equipment and material specified herein complete and operable. All standard accessories to the equipment specified shall be supplied even if not specifically mentioned in this specification. Material used in the fabrication of the specified equipment shall be new, unused, and of the highest quality available. Scope Work Included Furnish a high resistant ground system as detailed in these specifications. Any drawings or data sheets attached to the inquiry shall be considered part of this specification. The equipment shall be complete and operable. Provide production tests and inspections as detailed in this specification. To reasonably prevent the possibility of shipping damage, the manufacturer shall prepare the equipment for transportation to the jobsite and monitor the load out of this material. It shall be the responsibility of the manufacturer to furnish all material, connections, splices, links, special tools, and information required to completely reassemble the switchgear in the field or to facilitate the installation of the switchgear when performed by an electrical contractor. Guarantee the performance of the switchgear during a reasonable warranty period. This warranty shall, at a minimum, cover the equipment for eighteen (18) months from time of shipment or twelve (12) months from date of energization whichever occurs first. Supply all drawings, documentation, and information as detailed. Work Not Included Integral-mounted units. All physical assembly and connection is included with the exception of adjusting of neutral grounding resistor taps required to tune the system to existing site conditions. Programming of set points and alarms. Free-standing units. Mounting of unit at job site. Connection of incoming and outgoing cables or bus. Adjusting of neutral grounding resistor taps required to tune the system to existing site conditions. Connection of external control cables o

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档