01GeneralInstructionstoDesigners.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
01GeneralInstructionstoDesigners.doc

Facility Planning Control 1. GENERAL INSTRUCTIONS TO DESIGNERS RESPONSIBILITY FOR DESIGN 1. The designer is responsible for the design of the project. Quality Control of the design and design documentation is the responsibility of the Designer. The Designer is not to rely on or expect Facility Planning Control to review his documentation with the intent of detecting design or technical errors or to verify coordination among the disciplines. Review of the documentation by FPC, if any, will strictly be for compliance with programmatic requirements, design standards, State Building Code requirements and to verify that the Designer is fulfilling the terms of his Contract. If any failure on the part of the Designer to provide quality control for his documents results in additional costs to the Owner, the Designer will be held responsible. 2. The Designer shall provide an interdisciplinary coordination review of all documents. The Designer shall provide documentation that this review has been performed. Marked-up documents from this review or certification from a firm specializing in this work will satisfy this requirement. GENERAL REQUIREMENTS 3. The Designer shall be responsible for taking minutes of all meetings, during design and construction. 4. If at any time the Designer is called upon by the User or the Umbrella Agency to include work, the quality or quantity of which will raise the cost above the A.F.C., the Designer shall notify Facility Planning and Control (the Owner) in writing. 5. This department will not advertise a project for bids until the Construction Document Phase has been satisfactorily completed, in accordance with the Procedure Manual and these instructions. Letters of Approval from designated regulatory agencies are required before advertising for bids. 6. All submissions shall be made to the Owner. Each completed phase shall be made using the Design Phases Transmittal and Certification of Phase Completion Form, a copy of which is

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档