ElectricalSafetyRefresherforSubcontractElectricalWorkers.pptVIP

ElectricalSafetyRefresherforSubcontractElectricalWorkers.ppt

  1. 1、本文档共68页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Shock Approach Boundaries Limited Approach Boundary (LAB) Level II authorization required Only qualified workers may cross * Boundary must be physically established Restricted Approach Boundary (RAB) No unqualified workers Shock PPE required Shock PPE mainly consists of insulating gloves and tools Refer to slide 44 for LAB and RAB approach distances and required PPE. Arc Flash Protection PPE and flash protection boundary (FPB) in CSSP will match that of arc flash hazard (AFH) label on equipment If the electrical equipment is not provided with an AFH warning label, PPE and FPB in CSSP will be determined using the table in slide 44. Hazard Risk Categories (HRC) Hazard Risk Above Forty Calories: All equipment identified with a Level V (red) Arc Flash Hazard label Hazard Risk Greater Than 600 volts: Obtain flash hazard analysis. Exception: HRC 2 PPE shall be worn In 15 kV manholes. Head, face and glove protection may be removed during cable terminations if no other work is being performed in the manhole. Boundary and PPE Table Performing Your Work All circuits must be considered energized until LOTO’d and verified de-energized Several events at SNL have been the result of failure to verify de-energized Performance of the 0 energy verification still requires PPE and boundary establishment (slide 44) Do you have to do this hot? Physically establish the limited approach boundary (slide 44) Boundary must keep unqualified workers out of area Boundary must warn workers of the hazards inside the area * * Arc Flash - 2006 Operating Breakers and Disconnects Use one hand when possible. For side-handled switches, stand as far away to the side as possible to operate the switch. For panel-mounted breakers, do not stand in front of the panel when operating the breaker. Do not expose unprotected portions of the body/face to the potential blast. Review – Switching Operations Disconnect Rating Required PPE (Hazard Category) Up to and including 60 amps ( 600 volts) HC 0 * 60 up

文档评论(0)

***** + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档