Pipe before installation site should have condition is.docVIP

Pipe before installation site should have condition is.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Pipe before installation site should have condition is.doc

Pipe before installation site should have condition is: (1) the design drawings and other technical documentation is complete, the complete construction drawing already came, the construction organization design is ready and approved. (2) civil engineering related to the pipeline through inspection qualified, meet the installation requirements and the transfer formalities. Temporary facilities such as water supply, electricity supply, gas supply have meet the installation requirements. (3) technical disclosure and the necessary technical training has been completed, and fill out the construction clarificaiton records. (4) and pipeline connection equipment in place of fixed end, elevation, centerline, nozzle location comply with the design requirements. (5) must be completed before the pipe installation of related process, such as cleaning, degreasing, internal corrosion have been completed and the lining, and the acceptance inspection, have the related technical documents. (6) pipe, pipe fittings, instruments and valves have been calibrated and internal clean up, and have the relevant technical documents, and confirm that comply with the design requirements. Of pipe and pipe support, etc have inspection. (7) pipe installation entity shall gain special equipment installation permission. Pipeline construction, before the installation unit shall be responsible to pipe installation location for pipelines using notify registration of quality and technical supervision department. Case 1 h420040-2 】 【 1. Before the formal supply contracts, ability to cope with the suppliers production capacity and quality assurance, if manufacturer of technological process, production capacity and quality assurance ability can meet the requirements, the products have passed 3 c compulsory certification, you should write the supplier assessment report, the approval formalities shall be handled in accordance with the relevant procedure of quality system after its list of qualified s

文档评论(0)

挑战不可能 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档