Preliminary design should meet the construction bidding documents.docVIP

Preliminary design should meet the construction bidding documents.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Preliminary design should meet the construction bidding documents.doc

Preliminary design should meet the construction bidding documents, main equipment material order, prepare the needs of the construction drawing design documents. 5. Also need to review by the preliminary design is complete, and then submitted to the relevant government departments for examination and approval. 3, mechanical and electrical engineering project construction drawing design phase of the management tasks 1. The content of the construction drawing design stage management, including: the design scheme, implementation of design scheme, main technological layout, building structure arrangement; And design quality, design, design budgetary estimate of progress. 2. At the same time of construction drawing design to carry out the procurement of equipment material, organize supplier to design units to provide equipment technical data. 3. After completion of construction drawing design, according to the jurisdiction of the regulation to the government planning administrative department for examination and approval to obtain the planning permission. 1 P255 4. Will complete the construction drawing design of construction drawing design documents presented censors review, after review, construction drawing design documents shall be to the relevant administrative departments for the record. Four, mechanical and electrical engineering project construction phase clarificaiton and change management tasks 1. The disclosure should be made by the owner or the entrusted the overall contractor is responsible for organizing, should include the design, supervision, construction units, the relevant parties such as owner, disclosure should have written records, and the process of the consent of the parties to sign. 2. The design change after examination, shall forward through information management department in a timely manner to the relevant units, major design changes should be called in commenting, after review by execution, if the review of dissent is bigger, have

文档评论(0)

挑战不可能 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档