Project_Final_Report Panle line waste reduction Tuija.docVIP

Project_Final_Report Panle line waste reduction Tuija.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project_Final_Report Panle line waste reduction Tuija.doc

PROJECT FINAL REPORT CAla0002 Panel line waste reduction Alaj?rvi 1. Project Definition 3 1.1. Background and scope of the project 3 1.2. Project organisation 3 2. Project Execution and Achievements 3 2.1. Description of the project steps 3 2.2. Significant solutions 4 2.3. Metrics assessments 7 2.4. Financial assessment 8 2.5. Other gains 9 2.6. Timeline realization 9 2.7. Execution and achievements realization versus plan 9 3. Risks Realization 9 4. Lessons Learned 10 5. Future Plans 10 5.1. Control plan for the improved process 10 5.2. Future improvement ideas / plans 10 6. Other Relevant Project Documents 10 Project Definition Background and scope of the project In Alaj?rvi Panel manufacturing happened only in new line since February 2010. There has been many bottlenecks in rampup face and most worrying has been big amount of waste, which causes losses in Profit. There fore several OPEX projects started to ensure positive development in Panel manufacturing. Most important were “Panle line availability improvement” and “Panel line waste reduction”. The last one is presented in this document. The waste (second rate, scrap, the ends of the coil) from panel line have increase rapidly since the new panel line was taken into use, also the waste of glue is not followed at all. Because the production line is not stable yet, the waste and second-quality has arisen. The extra production must be done (compensation of the waste). The utilization rate of the line is not yet on target level. Project organisation Project Owner: Jukka Hernesniemi, Plant Manager Project Manager: Tuija Turja Production planner Process Owner: Jukka Hernesniemi Team Members: Ky?sti Viinam?ki, Employee Paavo Sillanp??, Employee Jani Niskanen, Employee V-P Sillanp??, Employee Jarmo Lakaniemi, Foreman Jyrki Niemi, Product testing Manager Project Execution and Achievements Description of the project steps Significant solutions Waste project starts simultaneously with availabilitys OPEX pr

文档评论(0)

挑战不可能 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档