钢结构招投标.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢结构招投标.doc

10. 1 The Procurement and Implementation of Structural Steel for Buildings Initial Decision. The procurement and implementation of structural steel for buildings begins with the owner’s decision to use steel as the primary structural system for the building. This decision is generally made early in the design process in conjunction with the architect and structural engineer for the project. The construction manager or design build firm advises the owner on material availability, costs, suitability, and scheduling aspects of the structural frame types. In many eases, the construction manager or design-build firm consults with steel fabricators for preliminary pricing, scheduling, and layout information that is used in deciding which structural system to utilize. Schematic Design. Once the decision is made to use a structural steel frame, the architect and structural engineer proceed with schematic design layouts for the building. Contract Documents. Upon completion of the schematic design studies, the architect and structural engineer proceed with design development and contract documents for the project. The structural engineer is primarily responsible for engineering of the structural steel frame and development of the detailed structural contract documents. The structural documents include foundation plans and details, structural floor framing plans,roof framing plans,column schedules, structural details, structural notes,and design loads,as well as the structural specifications. Bidding. After completion of the contract documents,the owner and architect prepare the bidding documents. Bidding documents are used together with contract documents to obtain bids from construction of for the contractors the building. The owner and architect solicit bids from qualified contractors using these documents. Bids for structural steel may be in the form of subcontract prices,which are included in the general contr

文档评论(0)

挑战不可能 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档