- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
fast and focused - building china’s railways
Fast and Focused – Building China’s Railways
John Scales, Jitendra Sondhi, and Paul Amos
World Bank Office, Beijing
Over the past few years, China’s railway sector has built an astonishing number of large and complex railway projects under its Mid and Long-Term Railway Development Plan. Many of these projects, such as high-speed lines, employ state of art technologies. They have been delivered much faster than is typical of just about any other country. How is it done? The paper argues that three factors dominate: the concentration of responsibility, power and access to resources in one organization; strong technical capacity and processes; and a program effect that delivers economies of standardization and scale. Whether the sheer speed of implementation has adversely affected the overall life-cycle costs and reliability of project infrastructure is not yet known.
THE challenge of A Century
China’s railways entered a new phase of development with the Mid and Long-Term Plan (MLTP) adopted in 2004 and revised upwards in 2008. It currently aims by 2020 to increase the total rail network from 75,000 to 120,000 route-km. It includes construction of 16,000 km of high-speed routes, three new regional inter-city networks, new dedicated coal lines and substantial double tracking and electrification. It is the world’s largest national railway development program for more than a century.
The government’s 2008 economic stimulus program encouraged and enabled the Ministry of Railways (MOR) to bring forward planned projects and ramp up individual project implementation speed to an unprecedented level. For example, the 1,068km Wuhan-Guangzhou high-speed railway, started construction in 2005 and was commissioned in December 2009. At the time of writing, this line and more than a dozen other high-speed lines initiated in the last five years have been completed.
A project that in China might take about 5-6 years from government approval of project concept to system commissioning
您可能关注的文档
- case strongstudystrong research - education.doc
- category original research paper - columbia.edu.doc
- central african hunter-gatherer research traditions - wsu.doc
- chairman’s strongreportstrong - logan city rugby union club.doc
- changing leadership behavior - marshall goldsmith library.doc
- chapter 10 motivation and emotion - gdufs.edu.cn.doc
- chaotic time series prediction using the kohonen algorithm.doc
- chapter 11 - probabilistic harmonic indices.doc
- chapter 25.doc
- chapter 4 needs and motives - stanford university.doc
- fiber optics communication - seminarsonly.doc
- field trial of sodium alginate-adsorbed clostridium.doc
- film strongstudystrong dead poets society.doc
- final year project report - talktalk.doc
- financial instrument pricing using c++.doc
- financial crisis of 2007–2010 - rutgers university.doc
- financial intermediation, loanable funds and the real sector.doc
- fishing gear and methods of the lower mesopotamian plain with.doc
- financing infrastructure in developing countries - project.doc
- fk yea i swear cursing and gender in myspace.doc
文档评论(0)