第二章交易磋商和合同的签订祥解.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第二章交易磋商和合同的签订祥解.ppt

第二章 交易磋商和 合同的签订 第一节 进出口合同签订 Key to Ex. 3 on P120 March 10, 2011 ABC COMPANY LTD. 35-36 STREET LONDON, U.K. Dear Sirs, We have received your L/C No. H982/M056378 opened by the Midland Bank Ltd. with many thanks. However, upon checking, we have found the following discrepancies which are not in compliance with the terms stipulated in the S/C No. HY88CLM98. 1. The amount in words is different from that in figure. The former is wrong as per the contract, and the contract amount is US DOLLARS FIVE HUNDRED THOUSAND. 2. The draft is paid at sight instead of at 60 days after sight. 3. Partial shipments and transshipment are not prohibited in the contract, which prohibited in the L/C. 4. Insurance should be effected for 110% of the invoice value instead of for 150%. 5. Documents should be presented for negotiation within 15 days after issuing shipping documents instead of within 5 days. 6. The sentence that the L/C should be subject to UCP600 should be added. Considering the goods have been ready for shipment, your prompt amendment to the L/C will be highly appreciated. Yours truly, SHANGHAI CEREALS AND OILS IMP. EXP. CORP. Key to Ex. 4 on P120-121 October 9, 2003 THE GENRRU TRADING CO. LTD. X X X KOBE, JAPAN Dear Sirs, Your L/C No. NLC0310598 issued by the Bank of Nagoya Ltd. has been received with many thanks, but we regret to point out the following discrepancies which are not in line with the terms and conditions of the contract. 1. The L/C amount should be USD172 066 instead of USD172 006. 2. The draft should be available at sight, not 60 days after sight. 3. The expiry place of the L/C should be in China, not in Kobe. 4. Documents should be presented for negotiation within 15 days after issuing the shipping documents instead of within 3 days. 5. The inspection clause should be “Inspection should be effected by the beneficiary before shipment. Relevant documents or certificates are requested to be issued by the Sha

文档评论(0)

光光文挡 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档