2#锅炉板梁安装记录要点.docVIP

  • 3
  • 0
  • 约6.51千字
  • 约 7页
  • 2016-05-01 发布于湖北
  • 举报
Turkey EREN (1+1) x600MW supercritical coal-fired unit project Project quality check and acceptance record  Work No.: GL-01.01.01.05 Description 2#锅炉钢架安装(板梁安装检查)Page 1 of 6 CMEC NEPC NEPC NEPC Turkey EREN (1+1) x600MW supercritical coal-fired unit project Project quality check and acceptance record  Work No.: GL-01.01.01.05 Description 2#锅炉钢架安装(板梁安装检查)Page 2 of 6 Dwg. No. Checking item Result MB-1 Visual checking No crack, no recurrent lap, no rust, no damage Manufacturer welding joint Welding joint fu

文档评论(0)

1亿VIP精品文档

相关文档