- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
道路工程(专业英语)
Road works
Roads resulting from human activities associated with,And to promote social progress and development,Is a symbol of history and civilization、A sign of scientific progress,The original road is formed by people trampling trails。After the requirements have a better road,Borrow pit fill,Frame wood across the river to Easy access。
Mid-18th century,Modern road construction began in Europe the rise. In 1747 the first bridge to establish the school in Paris. Teresa French P.-M.-J. cover、British Mark T. Telford and J.L. when other Engineers propose a new pavement structure theory and practice, Laid the foundation of modern road construction. 1883 - 1885 Germany G.W. Daimler、C.F. Benz invented the car,Created by automobile traffic and new road works in the modern era.
1931 ~ 1942, Germany built the highway network, Provides for the automotive traffic safety, speed, economy, comfort driving conditions.
Subgrade
Roadbed is the main route, is the basis of the road and the vehicle load and road surface to bear. Its cross-section of embankment fill and cut into the embankment-type situation, cutting style, half-filled and half-dug-style categories. Shoulder on both sides of the rembankment is within the zone edge for supporting the road, parked vehicles or for temporary pedestrian use.
Earthwork embankment into difficulty by excavation earthworks(Cultivation, ordinary soil, hard soil three) and Rock Engineering (soft rock, hard rock times, hard rock three).
Subgrade in road construction, Large projects, covering a wide,Often the key to control the construction schedule, So requirements:① as far as possible along with a combination of irrigation and water conservancy construction and strive to save space; ② in accordance with standard design, strict control of construction quality, to ensure sufficient strength and roadbed stability; ③ strengthening works to improve drainage and protection, along the river embankment should be careful not to be destroyed by flood; ④ fi
您可能关注的文档
最近下载
- 钢筋加工区作业指导书.pptx
- 新人培训 -药品.pptx VIP
- 我是整理大王小学二年级下册综合实践活动PPT课件.pptx VIP
- NB_T 10512-2021《水电工程边坡设计规范》.docx VIP
- 《喷气涡流纺值车工操作规程》.pdf VIP
- (高清版)DB13∕T 1825-2013 《地面辐射供暖供冷与新风系统技术规程》.pdf VIP
- 2024^2025学年北京市海淀区九年级上册期中物理试题 [含参考答案].pdf VIP
- 化工企业安全考试精品题库含精品答案.docx VIP
- 金属非金属矿山主要负责人和安全生产管理人员培训.pdf
- 基坑工程风险辨识及防范措施.docx VIP
原创力文档


文档评论(0)