5×40m预应力混凝土简支箱梁桥设计 毕业设计.doc

5×40m预应力混凝土简支箱梁桥设计 毕业设计.doc

  1. 1、本文档共121页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
学校代码 10126 学号 007290 分 类 号 密级 本科毕业论文(设计) ×40m预应力混凝土设计 学院、系 专业名称 年 级 学生姓名 指导教师 2011年5月21日 作用下的扭矩计算。 对于平面弯曲计算,通常可用熟知的材料力学公式,计算各横截面上的弯曲正应力和弯曲剪应力。对于扭转计算,一般来说,箱形薄壁杆件受扭后横截面将产生自由扭转剪应力,约束扭转正应力与剪应力以及截面发生歪扭引起的畸变正应力与剪应力。但根据经验,箱梁剪力滞,翘曲,扭转,以及畸变产生的应力都较小,可以乘以相应的系数得到,截面内力于活载作用力之和作为箱型梁的计算活载内力。 根据所得内力,进行了梁的预应力钢筋估算,估算了钢绞线的各种预应力损失,并进行预应力阶段和使用阶段主梁截面的强度和变形验算、挠度的计算。下部结构采用以钻孔灌注桩为基础的双柱式桥墩。 关键词:预应力混凝土、简支梁桥、钻孔灌注桩、夹片锚具、AutoCAD。 Abstract:This is a partial struct design of a flyover crossing that is over the railway inN, according to designing assignment and the standard of road and bridge. For the purpose of make the type of the bridge corresponding with the ambience and cost saving, this paper provides two different types of bridge for selection: the first one is pre-stressed concrete continuous bridge; the second one is double cantilever half through no-thrust arch bridge. After the comparisons of economy, appearance, characteristic under the strength and effect, the first one is selected. In this design, The checking calculation of strength of main girder was preceded not only in prestressed statement but also in using statement, deflection,precamber and the assessment of reinforcing steel bar were checked too. The pier of the bridge was basing on digging pile, and adopted rubber pot bearing. According to the characteristic of the overpass bridge and spot condition, it adopted the method that the cantilever job placing combined with bracket job placing. All of the design drawings were protracted by AutoCAD. Except that the thesis called A note on dynamic fracture of the bridge bearing due to the great Hanshin–Awaji earthquake was translated into Chinese, and made a report on. Keywords: prestressed concrete、AutoCAD、simple supported beam bridge、cast-in-place pile、cone anchora

文档评论(0)

绿风 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档