- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
本科毕业论文
建设项目实施阶段的单位工程造价管理
学 院: 土木工程学院
专 业: 工程管理
年级班级: 2008级2班
学生姓名:
指导老师:
2012年6月08日
建设项目实施阶段的单位工程造价管理
摘要
Construction project implementation phase of the unit project cost management
Abstract
The basic content of the project cost management, determine a reasonable and effective control of the project cost. Description at this stage of the project cost management, and strengthen the importance of the work of the various stages of project cost management, and proposed a number of key initiatives. The so-called construction of the project implementation phase of the unit project cost management, the use of certain methods and measures to reduce the cost of the project at all stages in the process of building a reasonable control of the scope and cost of the approved limit.
Keywords:Construction costs; the status of the construction project cost management; management of the investment decision-making stage under market economy conditions; the design stage; the implementation phase;
Even under the WTO and Chinas accession to the world community, Chinas construction industry how to effectively control construction cost of the construction and management of an important component part. However, the current budget for the construction projects - estimate, budget, Super budget accounts for the super three is still widespread and that eventually led to a serious loss of control of project investment. Project cost management is the basic contents to determine reasonable and effective control of the project cost.
As the project cost to the project runs through the entire process, stage by stage can be divided into Investment Decision stage, the design and implementation phases. The so-called Project Cost effective control is the optimization of the construction plans and design programs on the basis of in the building process at all stages, use of certain methods and measures to reduce the cost of the projec