《件人︰CIWEMHKciwemhk@hongkong.com》.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
《件人︰CIWEMHKciwemhk@hongkong.com》.doc

件人︰ CIWEM HK ciwemhk@ 收件人︰ colbert268@.hk colbert268@.hk 傳送日期︰ 2012年09月27日 (週四) 2:31 PM 主題︰ [CIWEM HK] Technical Visit to River/Channel Improvement Projects in Shenzhen City (深圳市河道治理工程) ? ? CIWEM HKTechnical Visit River / Channel Improvement Projects in Shenzhen City “深圳市河道治理工程” ? Dear CIWEM HK Members and Peers, This technical event will cover three project items under the river/channel improvement scheme in Shenzhen City: ? The Guanlan River Wetland (觀瀾河濕地) project site is located mid of Guanlan River in the vicinity to Jihe Gaosu (機荷高速) where the flows from Xikeng (西坑), Changkeng (長坑) and Qinghu Shui (清湖水) merge. This project included polluted flow interception along the river, treatment of wastewater, flood protection works to the river sections, provision of ecological zone, visual features and recreational ground. ?It also provided a demonstration wetland of 3 ha which could treat 30,000 cu m of effluent per day and the treated effluent could reach surface water Class III standard. ? Longhua Wastewater Treatment Plant Phase 2 (龍華汚水處理廠二期) is located to the mid of Guanlan River, and it served a city extension area of 88 sq km with design capacity of 250,000 cu m per day. The treatment plant received mixed flow of influent and adopted A2/O biological treatment, ultra filtration and UV disinfection. The treated effluent could achieve Class 1A standard. ? Futian River Project(福田河工程) is at Shenzhen city centre. The river passes through Bijiashan Park(筆架山公園) and Zhongxin Park (中心公園), with a catchment area of about 16 sq km and length of nearly 7 km.?The project enhanced flood protection to the river channel, extended polluted flow collection, reused reclaimed water; and provided greenery features. ? This event is co-organised by The Chartered Institution of Water and Environmental Management Hong Kong and International Association of Hydro-Environment Engineering and Research - Hong Kong Chapter ? Date: 13 October 2012 (Saturday)Registration Time: 7:45am ~ 8:0

文档评论(0)

jykt + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档