Discussiononhowtostrengthentheconstructionprojectcostmanagementwork.docVIP

Discussiononhowtostrengthentheconstructionprojectcostmanagementwork.doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Discussiononhowtostrengthentheconstructionprojectcostmanagementwork

I. Introduction. With the rapid development of the domestic economy, the constant improvement of the regulations, the growing competition in the construction market, the low bid is the inevitable trend of development of the market, the construction market has entered a low-profit and non-profit times, survival of the fittest, survival of the fittest, construction through its own strategic adjustment must improve the meticulous management standards in order to get the most value for money, the former SASAC Director Li Rongrong once said: The competition among enterprises is the first performance to price competition, price competition behind the main cost competitive . The cost index is good or bad indicators that reflect the level of enterprise management, cost control, project management, is gaining access to a source of economic benefits. Second, the impact of the main part of the cost management of construction enterprises. A wide range of cost management throughout the entire process of project management activities, planning began from the pre-bid contract to the project, construction preparation, site construction, until final acceptance, each cost management aspects are inseparable in this case under advanced cost management concepts and improve cost management system enterprise market initiative and competitive advantage and cost management a part of any deviation will affect the project benefits. Pre-bid evaluation. Marked before the deviation of the cost estimate and economic assessment will lead to project cost management deficiencies current construction market supply and demand imbalance between the prevalence of vicious competition within the industry, in the face of market pressures, many construction companies hesitate take the low bid, earnings hopes in subsequent project claims change as well as other ways to another pre-bid investigation a mere formality, tender documents and drawings reviewing research is not thorough, project construction diffi

文档评论(0)

zhanghc + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档