SDGEStudyInformation.docVIP

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SDGEStudyInformation

SDGE STUDY INFORMATION Background Pursuant to a CPUC request for data, SDGE studied four alternative system enhancement to identify respective system import and export capabilities. The study conducted thermal, voltage and stability analysis of each alternative to determine the above noted data. The four alternatives were: Serrano to Telega 500 kV, with selective undergrounding of existing 230 kV Highline to Imperial 230 kV with upgrades to CFE and IID systems Highline to Imperial 230 kV with Imperial to Miguel 500kV Devers to Miguel 500 kV Study Objectives The overall objective of this study is for San Diego Gas Electric Company (SDGE) to perform the technical power flow analysis necessary to evaluate the alternatives identified above. Specifically, each alternative identified above was studied to determine: Non-simultaneous Import Limits into SDGEs system. Export Limits for northbound flows from San Diego. Project Feasibility from an electrical system perspective. Overall Project Feasibility. Potential impacts on neighboring systems along with potential mitigation (addressed in a generic or conceptual fashion). Study Assumptions This technical study compared each of the above-identified alternatives electrical system performance to a Valley Rainbow benchmark case. All system studies were performed using a 2005 WSCC base case. A WSCC full-loop representation was used; this includes the Western United States, Western Canada and the system of Comision Federal de Electricidad (CFE) of Baja California, Mexico. Since the Project impacts the SDGE system, the SDGE system configuration was replaced with the latest detailed 2005 representation. The General Electric Power System Planning Program (GE-PSLF), Positive Sequence Load Flow), Version 12.0, was used in conjunction with in-house Engineer Programming Control Language (EPCL) routines to help analyze the study results. Load Forecast Assumptions Recent 2005 load forecast information was used for the SDGE, SCE and

文档评论(0)

zhanghc + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档