1、编制依据·················································2
2、工程概况················································ 2
3、施工组织·················································6
4、施工步骤及质量保证措施···································7
5、安装注意事项 ···········································11
6、安全文明与环保措施······································11
7、附件1:焊口详细清单、吊装机具布置图
一、编制依据
1.1、电力建设施工技术规范第5部分:管道及系统DL5190.5-2012
1.2、电力建设施工质量验收及评价规程第5部分:管道及系统DL/T5210.5-2009
1.3 、火力发电厂金属技术监督规程:DL/T438-2009
1.4 、焊接工艺评定规程:DL/T868-2004
1.5、电力建设施工质量验收信评定规程第7部分:焊接DL/T5210.7-2010
1.6、 F4281S-J0901 主蒸汽再热和旁路系统流程图及阀门表
1.7 、F4281
原创力文档