- 46
- 0
- 约4.25万字
- 约 78页
- 2016-06-06 发布于湖北
- 举报
* * * Lacquers and carbon deposits which result from oxidation accumulate around the hottest parts of the system - the discharge valves and piping. Deposits on valves interfere with their operation and may cause them to leak, distort and overheat. Deposits in the discharge piping can restrict air flow and build up pressure in the cylinders - a vicious circle which may lead to a fire or explosion. In 1963, 19 men were killed in a factory explosion in Germany. Where discharge temperatures are so high that mineral oils would be decomposed and cause a rapid build up of deposits on valves and in p
您可能关注的文档
- 矿井提升技术方案.ppt
- 髋关节撞击综合征技术方案.ppt
- 快题考试小型展览馆建筑设计技术方案.ppt
- 快速制造及其应用技术方案.ppt
- 快速消费品营销学习情境三技术方案.ppt
- 快速实施培训技术方案.ppt
- 快速成型加工技术方案.ppt
- 快速成型技术方案.ppt
- 快思聪智能家居文字技术方案.ppt
- 快思聪灯光控制系统技术方案.ppt
- ORing工业网络解决方案.pdf
- 如何使用XMind与制作3:4比例美观图片.pdf
- 重症医学相关精神障碍药物合理使用专家共识解读.pptx
- 重症医学专业医疗质量控制指标(2024年版).pptx
- 重症医学专业医疗质量控制指标(2024年版)解读.pptx
- “鸭力全消 喜乐出圈”商场购物中心五一玩梗出圈季活动方案.pptx
- 商场购物中心大悦城(潮π广场)打造计划美陈升级改造方案.pptx
- MUSIC FESTIVAL音乐节线上整合营销传播运营策划方案.pptx
- 26HR-162:企业招聘分析:招聘配置工作总结分析报告.pdf
- 白酒国窖1573冰·JOYS夏季交响音乐品鉴私宴会营销活动方案.pptx
原创力文档

文档评论(0)