长电公司翻车机压车梁改造.docVIP

  • 28
  • 0
  • 约1.49千字
  • 约 4页
  • 2016-07-05 发布于重庆
  • 举报
长电公司翻车机压车梁改造

长电公司翻车机压车梁改造 Changxing Power Generation Company Car Dumper Pressed train beam transformation 浙江浙能长兴发电有限公司(浙江 长兴 邮编313100) 沈卫强 ZHEJIANG ENERGY CHANGXING POWER GENERATION CO.,LTD.(zhejiang changxing Zip code 313100)用于铁路敞车散装物料翻卸的专用设备敞车挡料导致敞车翻卸提出了改造翻车机压车梁减少挡料的压车梁敞车中的物料翻卸干净,Car Dumper Railway gondola car for unloading of bulk materials over the special equipment, and Pressed train beams are in contact with the gondola car compactor compartment and Rotation the executing agencies. A long time, because of Pressed train beam structure causes blocking materials, cause unloading gondola over unclean q

文档评论(0)

1亿VIP精品文档

相关文档