- 1、本文档共142页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
重庆大学本科学生毕业设计
学 生:学 号:200指导教师:专 业:采矿工程
重庆大学资源及环境科学学院
二OO年六月Graduation Design of Chongqing University
Primary Design of Shihao Mine (900kt/a),Songzao Coal Electric Co.Ltd.
Undergraduate: Zhao Xizhong
Undergraduate Number: Supervisor: Prof. Gu Yilei
Major: Mining Engineering
College of Resources and Environmental Science
Chongqing University
June 2010
摘 要
重庆松藻煤电有限责任公司石壕煤矿井田内地质构造比较简单,控制本的主要构造为斜。XK8-6/110-KBT防爆蓄电池机车ABSTRACT
The geologic structure in the coalfield of Shihao Mine,Songzao Coal Electric Co.Ltd. is simple, the main structure is Yangchatan Anticline . The main coal seams that is designed has three layers.The burying depth is 6# coal seam,7# coal seam and 8# coal seam from shallow to deep.Their average thickness is 0.87m,1.01m and 2.56m respectively.Their angle of dip is 5o~o,the average is 16o,so they belong to low-pitched seams. The mine has high gas and danger of coal and gas burst, its relative gas emission rate is 80m3/t. All of coal seams has danger of coal-dust explosion . The designed capacity of the mine is 0.9 million t/a and the expected life of the mine is 57 years. Based on technique and economy comprisions,the plan chooses main inclined shaft and assistant shaft development for the mine,adopts long wall mining method along the strike and comprehensive mechanized coal mining.The auxiliary haulage system is separated from the main haulage,and the auxiliary haul system adopts the tramcar haulaged by anti-explosion accumulator locomotive system, which can satisfy the transportation of person , equipment, material and refuse. The main haul system adopts adhesive tape conveyor with 800mm by width, so the coal can be transported from the mining openning to the groud without person.The two-way diagonal ventilation system is used for the first level.
The development scheme and the mining method after a series comparisons of technique and economy can both be fulfilled the request of the mine
文档评论(0)