- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
【经典外文翻译】--基于现场总线监测系统的plc控制制造系统毕业设计
A Monitoring System For PLC Controlled Manufacturing System Based On Fieldbus
1. Introduction
The winding vacuum systems for plating metal such as zinc and aluminium on thin film are very common in the capacitance industry. The main goal is to increase as much as possible the film transport velocity while controlling the tension of the film. The tension and the speed of the film should be maintained at a reference value. The main concern is the coupling existing between film velocity and tension. There exist many sources of disturbances on the velocity (roller non-circularity, film sliding). If the delivery speed fluctuates, then the treatment on the film becomes nonuniform. On the other hand inappropriate tension may cause wrinkles or even a film break. Once film break takes place, the operator needs open the
winding chamber again. Obviously the pressure of winding chamber comes back to standard atmosphere pressure. And it will take about 20-30 minutes for winding chamber to reach the required pressure. Accordingly the output will decrease evidently. So a monitoring system to monitor tension fluctuation in order to avoid film break is very needful.
CC-Link is a field network system that processes both control and information data at high speed, to provide efficient, integrated factory and process automation. Using CC-Link enables users to reduce the amount of control and power wiring required in the complicated production line. Since users can select the suitable devices from more than 354 field devices
supported CC-Link it is easy to expand multi-vendor environment.
As for the communication of speed, this enables the communication with the sensor input which requires a high speed response and intelligent devices which requires a large amount of data communication.As one of CC-Links features, RAS functions such as, stand-by master function, detaching slave station function and auto return function enable recovery from the communication fault and the system debug at
您可能关注的文档
- 机械【经典外文翻译】--液压机hydraulic machine毕业设计.doc
- 小议成本控制(终稿)毕业设计.doc
- 浅析软件技术在工程造价管理中的应用毕业论文.doc
- 管理学实务管理者的角色定位与认知毕业论文.doc
- 教育学美国中学生性教育中品格教育探究毕业设计.doc
- 浅谈弗洛伊德的健康人格模型(终稿)毕业设计.doc
- 浅析出口托收业务的风险及其防范本科毕业设计.doc
- 浅谈物业管理收费难问题(终稿)毕业设计.doc
- 2012年某市七彩山鸡特种经济动物养殖建设项目建设实施-方案书毕业设计.doc
- 汽车液压翻转系统设计毕业论文.doc
- 部编版二年级上册道德与法治 期末测试卷精品(b卷).docx
- 部编版二年级上册道德与法治 期末测试卷精品(必刷).docx
- 部编版二年级上册道德与法治 期末测试卷附完整答案【全国通用】.docx
- 部编版二年级上册道德与法治 期末测试卷附完整答案(名师系列).docx
- 部编版二年级上册道德与法治 期末测试卷附答案【完整版】.docx
- 桥梁漆项目详细风险分析及评估报告.docx
- 部编版二年级上册道德与法治 期末测试卷附参考答案【巩固】.docx
- 部编版二年级上册道德与法治 期末测试卷附答案ab卷.docx
- 部编版二年级上册道德与法治 期末测试卷附参考答案(综合卷).docx
- 部编版二年级上册道德与法治 期末测试卷附参考答案【达标题】.docx
文档评论(0)