110KV站至观山10KV架空线避雷器更换安全技术措施.docVIP

  • 1
  • 0
  • 约1.95千字
  • 约 8页
  • 2017-05-11 发布于贵州
  • 举报

110KV站至观山10KV架空线避雷器更换安全技术措施.doc

110KV站至观山10KV架空线避雷器更换安全技术措施

110KV站至观音山风井场地10KV架空线避雷器及拉线更换检修安全技术措施 施 工 单 位:机电工区 施 工 负 责 人:李建兵 措 施 编 制:张义福 编 制 日 期:2014年月日 pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vib

文档评论(0)

1亿VIP精品文档

相关文档