- 2
- 0
- 约6.62千字
- 约 10页
- 2017-05-10 发布于贵州
- 举报
新张场河双线特大连续梁挂篮施工作业指导书
pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after taking safety measures, no d, lead on sliding-parameter shutdown process and after approval ratings down compared with (b). Capacity positive differential expansion of b, a, prone to the negative expand difference c, differential expansion does not change d, change little differential expansion turbine shutdown when the coastdown speed, due to the blast and Poissons effect, the rotor will appear (a) sudden increase. A, positive differential expansion of b, negative differential expansion of c, d, differential expansion mutation does not occur. Variable pressure operation of the unit, when the load changes, to (a) high-temperature components to changes in temperature. A and b increased c reduction, will not change d, the dramatic changes in the steam heat transfer between metal and larger metal parts caused by internal temperature (b). Greater the smaller the a, b, c, constant
PAGE \* MERGEFORMAT9
新张场河双线特大桥连续梁
挂篮施工作业指导书
一、目的
为了规范挂篮施工程序,严格控制施工过程,切实保证挂篮施工安全可靠,特制定挂篮施工作业指导书,请严格遵照执行。
二、适用范围
适用于成昆线成峨段扩能改造工程二标新张场河双线特大桥连续梁挂篮施工。
三、编制依据
1)铁道部《铁路工程施工组织设计指南》(铁建设[2009]226
您可能关注的文档
最近下载
- 河道整治工程施工质量创优计划的实施效果评估与改进策略.docx VIP
- 水利工程质量创优方案(3篇).docx VIP
- 110kv变电站的设计毕业设计(论文).docx VIP
- 华中师范大学《C++程序设计》2020-2021学年第一学期期末试卷.pdf VIP
- 电力系统仿真:电力系统暂态仿真all.docx VIP
- 电力系统暂态稳定性仿真研究毕业设计(论文).docx VIP
- 3 浮力——液面升降问题(原卷版).docx VIP
- 核心素养视域下的初中数学单元作业设计研究.docx VIP
- 纪念红军长征90周年演讲稿(2025年最新版).pptx VIP
- 2002-2012 十年北京卷高考语文试卷深度解析.pdf VIP
原创力文档

文档评论(0)