涪城区石塘镇红星区道路及绿化工程施工组织设计1.docxVIP

  • 4
  • 0
  • 约1.84万字
  • 约 35页
  • 2017-05-10 发布于贵州
  • 举报

涪城区石塘镇红星区道路及绿化工程施工组织设计1.docx

涪城区石塘镇红星区道路及绿化工程施工组织设计1

pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after taking safety measures, no d, lead on sliding-parameter shutdown process and after approval ratings down compared with (b). Capacity positive differential expansion of b, a, prone to the negative expand difference c, differential expansion does not change d, change little differential expansion turbine shutdown when the coastdown speed, due to the blast and Poissons effect, the rotor will appear (a) sudden increase. A, positive differential expansion of b, negative differential expansion of c, d, differential expansion mutation does not occur. Variable pressure operation of the unit, when the load changes, to (a) high-temperature components to changes in temperature. A and b increased c reduction, will not change d, the dramatic changes in the steam heat transfer between metal and larger metal parts caused by internal temperature (b). Greater the smaller the a, b, c, constant 第一章 编制说明 一、编制目的、宗旨 绵阳市涪城区红星社区七组公路工程 编制的指导思想是:投标时为业主着想,施工时对业主负责,竣工时让业主满意,同时在确保安全的前提下,力求经济合理,技术可靠,确保质量和工期。 二、编制依据 本施工组织设计编制依据是施工图纸,工程招标文件,国家现行规范、规程、标准,绵阳市有关建筑施工现场安全管理标准,并结合以往施工同类工程特点、施工经验、技

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档