漯驻高速试验段路工程施工方案修改版111.docxVIP

  • 19
  • 0
  • 约1.51万字
  • 约 26页
  • 2017-05-10 发布于贵州
  • 举报

漯驻高速试验段路工程施工方案修改版111.docx

漯驻高速试验段路工程施工方案修改版111

pump speed (c) is proportional. A, a party; B, the second party; C/third party. ... A, increasing amplitude increases with the increasing speed of b, the amplitude is independent of load amplitude decreases with the increase of load c, d, amplitude increases as the load when the static friction occurs when the turbo-generator shaft (b). A vibration phase angle is constant b changes, vibration phase angle is c, sometimes constant vibration phase angle and sometimes d, vibration phase angle start, later increased the load on the turbine swing value to a slow rate of speed control system (a). Inversely proportional to the proportional to a, b, c, a nonlinear relationship between d, independent of when the rotor critical speed lower than the speed (d) only when the oil film oscillation may occur. A, 4/5 b, 3/4 c, 2/3 d, at the sliding-parameter shutdown of 1/2, (c) steam turbine overspeed test. A, b, c after taking safety measures, no d, lead on sliding-parameter shutdown process and after approval ratings down compared with (b). Capacity positive differential expansion of b, a, prone to the negative expand difference c, differential expansion does not change d, change little differential expansion turbine shutdown when the coastdown speed, due to the blast and Poissons effect, the rotor will appear (a) sudden increase. A, positive differential expansion of b, negative differential expansion of c, d, differential expansion mutation does not occur. Variable pressure operation of the unit, when the load changes, to (a) high-temperature components to changes in temperature. A and b increased c reduction, will not change d, the dramatic changes in the steam heat transfer between metal and larger metal parts caused by internal temperature (b). Greater the smaller the a, b, c, constant 路基试验段施工方案 一、工程概况 京港澳高速公路漯河至驻马店改扩建工程土建工程A类LZTJ-1合同段起点为K0+000,终点为K9+295,路线全长9.295KM。路线起点位于郑漯高速公路改扩建终点,原漯驻设计桩号K3+706,南行进入老王坡滞洪区,跨淤泥河后在K9+340.56通道北侧台背处与2合同段相接。线路穿越漯河市召陵区邓乡镇王庄、漯河市后谢乡河东李村、西平县人和乡

文档评论(0)

1亿VIP精品文档

相关文档