南吕梁山隧道施工通方案技术总结.docxVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
南吕梁山隧道施工通方案技术总结

At present, the County personnel totaled 93,000 people, is three times times of 2010. Review the work of the past five years, the County formed to encourage innovation, innovation, participation in innovative atmosphere, a large number of innovations emerging high-level personnel leading the increasingly strong role; innovative idea further innovations gradually expanded from economic to social governance, public safety, intelligence and other areas of urban construction, innovation and talent support becomes increasingly important. Of hard work, the county levels to cherish, continue to consolidate, improve and, for the future development, to remain sober-minded, scientific foresight, courage to play. Under the influence of complicated international and domestic situation, the domestic economic situation, and General Secretary of stability, but downward pressure on large trend of differentiation and deepening of structural adjustment sums up the current situation. From Dongping actual see, Thirteen-Five during, County faced stable economic growth, and deepening structure adjustment of double task, both faced with economic total small, and per capita level low, and industry structure not reasonable, and economic development way extensive, basic situation, more has industry cluster early now prototype, and Park hosted capacity constantly enhanced, and resources traffic location advantage increasingly appeared, and cadres masses innovation venture passion 南吕梁山隧道施工通风方案技术总结 南吕梁山隧道位于山西省临汾市境内,隧道进口端位于蒲县境内,出口端位于临汾市尧都区与洪洞县交界处,设计为双洞单线隧道。隧道设计为双洞单线铁路隧道,线间距30m,左线全长23443m,右线全长23473.5m。我公司承建进口段工程,左线进口里程 DK298+175,右线进口里程为DK298+145, 进口工区施工分界里程 DK301+307,左线长3.132km,右线长3.162km。隧道进口端洞口段各设置3个风机段,每个风机段长75m;隧道每间隔500m左右设置联络横通道;单侧60m设置一处小避车洞,左右侧交错布置。施工通风是长大隧道施工的重要配套工艺之一,下面是我公司对施工过程中的通风设计方案进行的技术总结。 1 施工通风设计标准 根据铁道部2002年3月发布的《铁路隧道施工规范》(TB10204-2002)规定,隧道施工作业环境应达到以下标准: 1、隧道中氧气含量按体积百分含量计不得小于20%。 2、粉尘最高容许浓度,每立方米空气中含有10%以上游离二氧化硅的粉尘为2mg;每立方米空气中含有10%以下游离二氧化硅的粉尘浓度为4mg。 3、有害气体最高允许浓度: (1)一氧化碳最高容许浓度为3

文档评论(0)

aining + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档