岱河煤矿1.2Mta新井机械CAD图纸设计.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
充值下载即送CAD图纸,QQ36396305

摘 要本设计包括三个部分:一般部分、专题部分和翻译部分。 一般部分为矿t/a新井设计。煤矿位于省市交通便利井田走向()长约,倾向()长约,井田总面积为2。主采煤层为号煤,平均倾角为,煤层平均总厚为m。井田地质条件较为简单井田工业储量为t,矿井可采储量t。矿井服务年限为a,涌水量不大,矿井正常涌水量为m3/h,最大涌水量为m3/h。矿井瓦斯涌出量较为瓦斯矿井。 井田为双开拓。大巷采用胶带运输机运煤,辅助运输采用矿井通风方式为通风。 矿井年工作日为30d,工作制度为“”制。一般部分共包括10章:1.矿区概述及井田地质特征2.井田境界和储量3.矿井工作制度及设计生产能力、服务年限4.井田开拓5.准备方式-区巷道布置6.采煤方法7.井下运输8.矿井提升9.矿井通风与安全技术10.矿井技术经济指标。专题部分题目翻译部分主要内容Study of mechanical principle of floor heave of roadway driving along next goaf in fully mechanized sub-1evel caving face 关键词:工业储量 ;立井开拓 ;工作制度 ;采煤方法 ;矿井通风 ABSTRACT This design includes of three parts: the general part, special subject part and translated part. The general part is a new design 1.2Mt/a of daihe mine. Daihe mine lies in northeast of Huaibei of An’hui province. The traffic of road and railway is very convenience to the mine. The run of the minefield is 1.3-4.0km ,the width is about 5.6km,well farmland total area is 1.16㎞2.The is the main coal seam, and its dip angle is 8.5 degree. The thickness of the mine is about 4.64m in all. The proved reserves of the minefield are 127.39Mts. The recoverable reserves are 89.87Mts.The service life of the mine is 53.49 years. The normal flow of the mine is113.66m3 percent hour and the max flow of the mine is 191.52 m3 percent hour. The mineral well gas gushes the deal lower, for low gas mineral well. The well farmland is two level in shaft well to expand. The working system “three-eight” is used in the daihe mine. It produced 330d/a. This design includes ten chapters: 1.An outline of the mine field geology; 2.Boundary and the reserves of mine; 3.The service life and working system of mine; 4.development engineering of coalfield; 5.The layout of banes; 6.The method used in coal mining; 7.Transportation of the underground; 8.The lifting of the mine; 9.The ventilation and the safety operation of the mine; 10.The basic economic and technical norms. Special subject parts of topics is the resources of mining technology abandoned coal pillar. Translation

文档评论(0)

***** + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档