- 1、本文档共3页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
寒假社会实践报告1000字
there? After ignition, combustion should focus its attention on what? Reducing boiler hot loss measures? DC-what are the main characteristics of the boiler? Boiler steam after Bao Biwen how? when shutdown to control steam drum wall temperature difference? From a run standpoint, what are the main measures to reduce coal consumption for power supply? Talk about how to control the water level? Generator after splitting, 6KV why to promptly exit the standby power switch? Why the current transformer secondary side in the operation are not allowed to open? Why synchronous generator excitation circuit of the degaussing switch can be changed into a lively breaker? Generator step-up process, why the rotor and stator currents to monitor? Why are rotor one point ground prone to 2nd after ground? Try 380V discussed following the grounding of auxiliary power system, wiring for three-phase five-limb terminal of PT secondary voltage change? Generator incomplete phase operation principle is what? Yn,d11 (Y0/-11) connection of generator-transformer systems, generator open-phase running any help? Why to install 100% stator grounding protection for large generator? Why does not allow running secondary short circuit? Generator excitation, excited, what is the of the overexcitation limit? Generator loss of excitation in the running, what is the impact on the system and the generator itself? Anti-cuozhong on the prevention of excitation system of generator caused by fault what damage? try discussing what are the measures of improving power system dynamic stability? What is a switching operation of the electrical equipment? main content switching operation of power plants and power systems are there? Try discussing malignant electric misoperation, which misuse personal, most of the equipment? Switch service power fast cutting device in several ways? in the alternate to the State, the standby power switch refused to deal with? Try discussing switching operations should focus on preven
您可能关注的文档
- 宿舍调换申请书.doc
- 密切联系群众是我们党的三大作风之一.doc
- 富士康参观实习报告范文3000字.doc
- 富士康生产线实习报告结尾范文.doc
- 寒假三下乡支教社会实践报告.doc
- 寒假个人实习报告范文.doc
- 寒假临时工实习报告.doc
- 寒假乘务员社会实践报告范文.doc
- 寒假会计电算化社会实践报告模板范文.doc
- 寒假促销实习报告2000字.doc
- 2024年度安永全球另类投资基金调查报告.docx
- 2024年中国汽车产业出海回顾分析 -中汽信科国际化研究团队.docx
- 【民航局国际合作服务中心】马尔代夫民航业发展研究报告.docx
- 2025走向融合与深化的中国媒介市场报告-星传媒体.docx
- 2023Givaudan和ESG目的与性能.docx
- 中国民间应对气候变化行动故事集-教育故事.docx
- 2025AI制药市场规模产业链构成应用现状及AI制药公司分析报告.docx
- 医疗器械专题之基因测序:分子诊断掌上明珠,四代测序开启规模化应用时代.docx
- 2024年中央银行黄金储备调查报告 202406.docx
- 智慧芽 -2024第4季度全球潜力靶点及FIC产品调研报告.docx
文档评论(0)