- 2
- 0
- 约4.51万字
- 约 27页
- 2016-07-26 发布于辽宁
- 举报
年产5万吨氯化法钛白粉工程项目立项建设可行性分析论证研究报告
and solve this problem. He knew that cholera would never be controlled until its cause was found.?He became interested in two theories that possibly explained how cholera killed people. The first suggested that cholera multiplied in the air. A cloud of dangerous gas floated around until it found its victims. The second suggested that people absorbed this disease into their bodies with their meals. From the stomach the disease quickly attacked the body and soon the affected person died.?John Snow suspected that the second theory was correct but he needed evidence. So when another outbreak hit London in 1845, he was ready to begin his enquiry. As the disease spread quickly through poor neighborhoods, he began to gather information. In two particular streets, the cholera outbreak was so severe that more than 500 people died in ten days. He was determined to find out why. ?First he marked on a map the exact places where all the dead people had lived. This gave him a valuable clue about the cause of the disease. Many of the deaths were near the water pump in Broad Street (especially numbers 16,37, 38 and 40) . He also noticed that some houses (such as 20 and 21 Broad Street and 8 and 9 Cambridge Street) had had no deaths. He had not foreseen this, so he made further investigations. He discovered that these people worked in the pub at 7 Cambridge Street. They had been given free beer and so had not drunk the water from the pump. It seemed that the water was to blame.?Next, John Snow looked into the source of the water for these two streets. He found that it came from the river polluted by the dirty water from London. He immediately told the astonished people in Broad Street to remove the handle from the pump so that it could not be used. Soon afterwards the disease slowed down. He had shown that cholera was spread by germs and not in a cloud of gas.?In another part of London, he found supporting evidence from two other deaths that were linked to the Broad Street outbreak
您可能关注的文档
- 某煤矿安全改造项目可行性分析论证研究报告.doc
- 某某标准化奶牛养殖示范场建设项目立项建设可行性分析论证研究报告项目建设立项建设可行性分析论证研究报告.doc
- 某某仓储式物流产业园建设项目立项建设可行性分析论证研究报告.doc
- 某某成品油原油及销售物流项目立项建设可行性分析论证研究报告.doc
- 某某瓷业有限公司耐热陶大型宽截面天然气隧道窑立项节能技改项目立项建设可行性研究论证报告.doc
- 某某纺织公司服装加工生产线项目项目立项建设可行性研究论证报告.doc
- 某某大型石化物流基地建设项目立项建设可行性分析论证研究报告(p126页优秀甲级资质立项建设可行性分析论证研究报告).doc
- 某煤矿年产3万吨煤可行性分析论证研究报告.doc
- 某某纺织有限公司利用废塑料生产三维中空纤维项目立项建设可行性分析分析论证研究报告.doc
- 某某河大桥建设项目立项建设可行性分析论证研究报告(word版本).doc
- 年产5万吨浓香花生油项目立项建设可行性分析论证研究报告.doc
- 年产5万吨浓香花生油项目立项建设可行性分析论证研究报告书.doc
- 年产5万吨双孢菇工厂化栽培项目立项建设可行性分析论证研究报告(初稿).doc
- 年产5万吨铜棒、铜生生产线项目立项建设可行性分析论证研究报告.doc
- 年产5万吨铜杆生产线建设项目立项建设可行性分析论证研究报告.doc
- 年产5万吨微冻液产业化项目立项建设可行性分析论证研究报告.doc
- 年产5万件包装带生产项目立项建设可行性分析论证研究报告.doc
- 年产5万立方米球硅复合无机轻质建筑保温材料新产品开发项目立项建设可行性分析论证研究报告.doc
- 年产5万套金属制品模具立项建设可行性分析分析论证研究报告.doc
- 年产6万吨腐植酸盐建设项目立项建设可行性分析论证研究报告.doc
原创力文档

文档评论(0)