Aging data centers: Last year, The Gartner Group said that any data center built prior to 2000 was likely to be obsolete Increasing power cooling consumption In 2006, U.S. data centers consumed 61 billion kilowatt-hours of electricity. This is equal to about 1.5% of total U.S. electricity consumption. By 2011, it is estimated that data centers will consume over 100 billion kWh, representing a $7.4 billion annual electricity cost. In 2007, Mellon Financial Corp. announced that it would spend $70 million to expand the power cooling infrastructure at a Pittsburgh-area data center that was less than a year old. A study done in February and March of this year by IntelliClear for HP showed that the average power consumption per rack in the U.S. is now over 11 kW. Increasing cost of power Last year, the DOE said the average retail price of electricity increased by 9.1%. The largest jump in 25 years. 空调布置在热通道 These have been vetted with multiple customers. Test your customer’s sensitivity to each of these challenges. Compute / storage / power maximum density in their IT environment is a key customer requirement Cost, including both lower cost of operation and the ability to “pay as you grow” instead of paying to build capacity for the future (typically a brick-and-mortar data center is built for future maximum capacity, and is not immediately filled with IT) Much faster time of deployment, and the flexibility to deploy worldwide Autonomy, and ability to operate a lights-out environment so local support is not a requirement Reliability: While our container is designed as a Tier I / Tier II data center environment, it is possible to configure the container with redundant power and cooling etc. feeds to increase container resiliency at the expense of container capacity. Some customers will request maximum capacity and thus less redundancy, others will choose to balance additional redundancy. 600kW+ 27 kW 每机架 22 个 50U 机架 (1100U IT计算空间) 高达3,520 节点 多至12,320 HDD 冷却水散热 防火与
文档评论(0)