国外发电机定子吊装技术方案.pptxVIP

  • 5
  • 0
  • 约1.3千字
  • 约 17页
  • 2016-08-19 发布于江苏
  • 举报
135MW GENERATOR LIFTING INSTALLATION PROCEDURE OBJECTIVE To safely lift and install the 135 MW Generator into its foundation To ensure safety of the cargo and all personnel involved in the lifting job LIFT PLAN LIFT PARAMETER WEIGHT OF LOAD: 140 TONS DIMENSION (mm): Approx. 6100 x 4320 x 3800 PERSONNEL 1 x PIC (Personnel In-Charge) 1 x Hydraulic Gantry Operator 8 x Topside Riggers 4 x Spotters EQUIPMENTS ADDITIONAL REQUIREMENTS Customer shall make sure ground stability in the lifting area. Customer to concrete the area with sufficient ground bearing capacity and provide anchor bolts to secure the support legs of the Lifting Gantry. PROVIDED BY CONTRACTOR PROVIDED BY CLIENT 1. 4-Point Hydraulic Gantry Lifting System 1. Crane, 60 Ton 2. Accessories: 2. Hydraulic Transporter Runway Track Runway Track Support Legs Braces Lifting Beams Support Beams 3. Overhead Crane 4. Scaffoldings 5. Power Supply, 3-phase, 440V AC LIFTING INSTALLATION PROCEDURE Set-Up Lifting System as shown LIFTING INSTALLATION PROCEDURE (Cont’d…) Lift Generator using Hydraulic Gantry LIFTING INSTALLATION PROCEDURE (Cont’d…) Roll Generator directly above its mounting pad. LIFTING INSTALLATION PROCEDURE (Cont’d…) Lower and secure the Generator to its mounting pad PLANS DRAWINGS THANK YOU!

文档评论(0)

1亿VIP精品文档

相关文档