135MW GENERATORLIFTING INSTALLATION PROCEDURE
OBJECTIVE
To safely lift and install the 135 MW Generator into its foundation
To ensure safety of the cargo and all personnel involved in the lifting job
LIFT PLAN
LIFT PARAMETER
WEIGHT OF LOAD: 140 TONS
DIMENSION (mm): Approx. 6100 x 4320 x 3800
PERSONNEL
1 x PIC (Personnel In-Charge)
1 x Hydraulic Gantry Operator
8 x Topside Riggers
4 x Spotters
EQUIPMENTS
ADDITIONAL REQUIREMENTS
Customer shall make sure ground stability in the lifting area. Customer to concrete the area with sufficient ground bearing capacity and provide anchor bolts to secure the support legs of the Lifting Gantry.
PROVIDED BY CONTRACTOR
PROVIDED BY CLIENT
1. 4-Point Hydraulic Gantry Lifting System
1. Crane, 60 Ton
2. Accessories:
2. Hydraulic Transporter
Runway Track
Runway Track Support Legs
Braces
Lifting Beams Support Beams
3. Overhead Crane
4. Scaffoldings
5. Power Supply, 3-phase, 440V AC
LIFTING INSTALLATION PROCEDURE
Set-Up Lifting System as shown
LIFTING INSTALLATION PROCEDURE (Cont’d…)
Lift Generator using Hydraulic Gantry
LIFTING INSTALLATION PROCEDURE (Cont’d…)
Roll Generator directly above its mounting pad.
LIFTING INSTALLATION PROCEDURE (Cont’d…)
Lower and secure the Generator to its mounting pad
PLANS DRAWINGS
THANK YOU!
您可能关注的文档
最近下载
- 2025年陕西省中考数学真题试卷含答案.pdf VIP
- 一年级英语寒假作业.pdf VIP
- 微生物技术 走进微生物世界 微生物技术—走进微生物世界.pptx VIP
- 《植物组织培养》课程教学大纲(本科).pdf VIP
- 2025年重庆市公务员省考《行测》联考真题(含答案).pdf VIP
- 2026年一年级英语【寒假作业】.docx VIP
- 抽象函数的单调性.doc VIP
- 2025年重庆市公务员考试行测真题及答案详解(最新).docx VIP
- 2025年特许金融分析师私募股权投资中的公司尽职调查专题试卷及解析.pdf VIP
- 2025年金融风险管理师久期与债券流动性风险的交互影响专题试卷及解析.pdf VIP
原创力文档

文档评论(0)