60万吨每年真空制项目冬季施工方案
目 录
1、工程概况·················································(2)
2、编制依据·················································(2)
3、施工程序·················································(3)
4、施工方法及技术措施·······································(6)
5、施工进度计划·············································(14)
6、降低成本措施·············································(15)
7、施工质量保证措施·········································(15)
8、施工安全与环境保护技术措施······························(20)
9、施工平面布置与文明施工技术措施··························(31)
10、劳动力需要·············································(32)
11、施工机具、计量器具与施工手段用料计划············