城市地铁隧道盾构法工地表沉降分析1.docVIP

城市地铁隧道盾构法工地表沉降分析1.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
城市地铁隧道盾构法工地表沉降分析1

日 城市地铁隧道盾构法施工地表沉降分析 Cities metro shield tunneling surface subsidence analysis 学生姓名 指导教师 摘要 Abstract Shallow Tunnels overlying strata had no self-load capacity, the load should all by tunnel supporting structure to bear, but in fact, not only the soil, even dry sand, formation can still form a natural arch out. Large amounts of data showed that with the foundation soil compression modulus increases, land subsidence decreases. In the soil compression modulus is small, ground subsidence and horizontal displacement modulus changes by a great impact, with the shield diameter increases, caused by shield construction unit length increases as ground loss on in the same slot width of land subsidence in the case, along with the maximum ground subsidence increases; while the tunnel Futuhoudu larger, the smaller the maximum value of ground subsidence, but the ground subsidence trough width is greater. Maximum ground subsidence with Futuhoudu shield diameter ratio with that of H / D increases. Earth pressure tank pressure is too large, ground uplift, the pressure is too small, ground settlement produced. Shield forward process, shield correction, kowtow, rise, curve propulsion caused overbreak will make more than the actual design of the excavation face excavation face, causing excess ground loss. Shield pause in advance, the jack may cause retraction spill shield back, so that the excavation face slump or loose soil, causing formation damage. The shield casing has a certain thickness, in order to facilitate the assembly and the shield tube sheet corrective shield case and the lining in a certain gap between the retention. Jack push shield before the row, the shield tail lining segments forming the building perimeter gap, making the soil around the building to fill the gap occurred flock tunnel caused the displacement of ground subsidence. Keywords: Finite Element; Shield ; Settlement

文档评论(0)

yaoyaoba + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档