- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8 well servicing 油井服务(S)
8 Well Servicing
8.1 General
Well servicing involves multi-party operation and presents potential hazards to personnel and assets.
Communication among all parties involved is crucial to the successful performance of well servicing operations. This communication shall begin from pre-job planning and continue until the job is completed.
Upon arriving at the location, the service company’s representative should report directly to the client‘s onsite representative and rig manager. They will be sent to the appropriate place for safety orientation and accommodations.
It is recommended that a joint operational meeting should be held with all service companies concerned. This meeting should be held immediately prior to the job.
A combined pre-job safety meeting should be held with all related service and rig personnel before the work be conducted. The meeting shall include reviewing the task, responsibilities and coordinating combined efforts; analyzing potential danger, hazardous chemicals/ materials to be used and safety and risk control measures; identifying the hand signals or other means of communication, etc.
A safe zone should be cordoned off to indicate potential high danger zones such as pressurized lines, overhead falling objects, etc.
As to safety requirement of special operations such as handling radioactive sources or explosive devices, refer to 7.4 Handling of Dangerous Substance
8.2 Wireline Logging
A pre-job safety meeting shall be held prior to wireline logging.
Lift wireline logging equipment by means of air tugger shall be directed by dedicated person. Slings and hooks shall be firmly secured. Brakes should be firstly checked or inspected before operating air hoist, and the operation should be performed by following relevant operational rules and regulations.
Sheave at wellhead must be firmly fixed. Pins on rotary table should be firmly locked when installing pulleys on the rotary table to avoid rotation of the rotary table.
When inst
您可能关注的文档
- 6.2-8255的原理.ppt
- 6.3约束装配.doc
- 6.2绝缘材料.ppt
- 6.4 主轴伺服系统.doc
- 6.4寸寸工业液晶显示器.doc
- 6.8综合布线系统.doc
- 6.单项作业卡_601吹灰操作卡.doc
- 6.含硅矿物与信息材料.docx
- 6.采掘机电维修规程.doc
- 600MW仿真机竞赛复习资1.doc
- 2025年中国储罐市场前景预测及行业投资潜力预测报告.docx
- 2024中考语文押题作文:【阅读类】作文(范文4篇,可打印).pdf
- 2025年中国改装汽车起重机行业发展监测及投资战略研究报告.docx
- 2025年机电电工电子题库 .pdf
- 教师资格考试高级中学信息技术学科知识与教学能力2025年上半年测试试题与参考答案 .pdf
- 中国CNG气瓶行业市场需求预测及投资规划建议报告.docx
- 2025年中国智能电力仪表行业市场调查研究及发展战略规划报告.docx
- 2025年中国接触燃烧式气体传感器行业市场调查研究及投资前景展望报告.docx
- 2025年机电安装冬雨季施工措施.pdf
- 2025年机电安装工程安全技术交底大全.pdf
文档评论(0)