- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
8 well servicing 油井服务(S)
8 Well Servicing
8.1 General
Well servicing involves multi-party operation and presents potential hazards to personnel and assets.
Communication among all parties involved is crucial to the successful performance of well servicing operations. This communication shall begin from pre-job planning and continue until the job is completed.
Upon arriving at the location, the service company’s representative should report directly to the client‘s onsite representative and rig manager. They will be sent to the appropriate place for safety orientation and accommodations.
It is recommended that a joint operational meeting should be held with all service companies concerned. This meeting should be held immediately prior to the job.
A combined pre-job safety meeting should be held with all related service and rig personnel before the work be conducted. The meeting shall include reviewing the task, responsibilities and coordinating combined efforts; analyzing potential danger, hazardous chemicals/ materials to be used and safety and risk control measures; identifying the hand signals or other means of communication, etc.
A safe zone should be cordoned off to indicate potential high danger zones such as pressurized lines, overhead falling objects, etc.
As to safety requirement of special operations such as handling radioactive sources or explosive devices, refer to 7.4 Handling of Dangerous Substance
8.2 Wireline Logging
A pre-job safety meeting shall be held prior to wireline logging.
Lift wireline logging equipment by means of air tugger shall be directed by dedicated person. Slings and hooks shall be firmly secured. Brakes should be firstly checked or inspected before operating air hoist, and the operation should be performed by following relevant operational rules and regulations.
Sheave at wellhead must be firmly fixed. Pins on rotary table should be firmly locked when installing pulleys on the rotary table to avoid rotation of the rotary table.
When inst
您可能关注的文档
最近下载
- 2025年(组织、党纪)一对一谈心谈话记录+支部委员与普通党员日常谈心谈话记录.doc VIP
- 《GB/T 18336.3-2024网络安全技术 信息技术安全评估准则 第3部分:安全保障组件》.pdf
- 《图形图像处理》课程标准.pdf
- 交通大学三位一体招生部分试题回忆(数学)问卷6.11资料.doc VIP
- 孔雀东南飞挖空练习附答案.docx
- 降低降低阴道分娩并发症实施方案.docx
- 京族民族文化融入小学美术教学策略研究.pptx VIP
- 乙醇安全技术说明书(MSDS).docx
- 2024年教师招聘考试专业知识(幼儿园)历年试题(附带答案).pdf VIP
- 西安开放大学2022年《现代企业管理方法》平时作业1-4答案.docx VIP
文档评论(0)