- 9
- 0
- 约1.31万字
- 约 12页
- 2016-08-23 发布于重庆
- 举报
机械类两篇外文翻译
英文题目一 Overall-mechanized assembling line for
Production in the uzbekkhimmash works
Shell 翻译内容 The process of shell production applied in the Uzbekkhimmash Works involves a great number of adjusting and transporting operations. The latter are carried out with the help of electric overhead cranes which lengthens the production cycle. To eliminate these deficiencies according to the VNIIPTkhimnefteapparatury, an overall-mechanized assembling line was constructed and introduced in the plant; it is used in the production of boiler sheels of diameters from 600 to 2200mm, lengths up to 2000 mm and w
您可能关注的文档
最近下载
- 产品结构设计准则--扣位 ( Snap Joints ).doc VIP
- (高清版)B/T 43999-2024 应急呼吸道传染病患者转运设备技术要求.pdf VIP
- (高清版)DB35∕T 1824-2019 军粮供应网点经营规范.pdf VIP
- 2023年广东广州中考数学真题(含答案).pdf VIP
- 初中数学知识点-初中数学知识点总结归纳(完整版).docx VIP
- 26_总经理等岗位考核维度与周期.pdf VIP
- 产品结构设计准则--入件 ( moulded-in inserts ).doc VIP
- 自考《电气防火及火灾监控》精讲+习题(全).pptx
- 2025国际压疮指南精要.pptx
- 2026年二级建造师《建筑实务》案例简答200问.pdf VIP
原创力文档

文档评论(0)