电梯调试简明.doc

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
电梯调试简明

OPEX调试简明指南 Commissioning-manual 类 型:技术文件 编 号: FOD-FT/现场技术科 2006-5-16 1/4 1、电梯第一次启动的准备工作:Preparation before first start: 序号NO. 步骤STEP 备注REMARK 1 电梯供电已使用正式供电,电气系统的机房线路敷设完成,联结准确,带电的零部件接地保护可靠。 Official power, The wire is connected in machine room exactly, the electriferous accessory of effective grounding. 2 电梯机房实行管制,严防闲人进入。进出机房的通道保持畅通 The machine room is controlled, idler is forbid. Keep channels expedite. 3 电梯安全部件全部安装完毕,并调整到位 The safety part is installed absolutely and exactly. 4 电梯井道、底坑、机房楼板面上多余孔洞,凸出物件,都已处理。 Has handled with redundant holes and protruding in hoistway, pit and machine room floor 5 电梯层门全部安装完毕,机械锁扣锁合可靠。自复装置和厅外开锁工作正常。门机的门刀最好不要安装。 Landing door is installed absolutely, machine hook is effective. Self-regulation device and door locking device work normally. Do not install door vane best. 6 轿厢内和轿顶禁止堆放过多过重的物品。 Do not be overcharge in the car and on top of the car. 7 分出电梯额定载重量一半的对重块,将其余对重块装入对重架次 。此时应注意,轿厢装潢的重量。 Take half of rated load, others encase in counterweight shelf. Attention weight of the decorative car. 8 如随行电缆、井道电缆已经敷设,应检查不能与轿厢和对重相刮碰。 If traveling cable and hoistway cable has been installed, do not come into contact with car and counterweight. 9 如随行电缆、井道电缆已与控制柜相联,请拆开联线。保证控制柜通电时,随行电缆、井道电缆不带电,以防发生事故。 If traveling cable and hoistway cable has been connected by controller, disconnected it. Pledge the traveling cable and hoistway cable without power when electrified controller. 10 层门口的召唤和楼层显示等的底盒应安装好,防止装这些器件的孔洞直通井道内。 Install the calling board at Landing entrance. 11 井道内的样板架,脚手架,轿厢安装支撑架,安装生命线拆离。 Jig, scaffold, install car support and life line has been dismantled in hoistway. 12 曳引钢丝绳的涨紧度作初步调整,两次保护已做好。 Hoist ropes has been elementary adjusted, twice protect has been accomplished. 13 曳引机、电动机、液压缓冲器按要求加好油。 Put traction machine, motor and hydraulic buffer on steam according the request. 2、电动机参数自学习Motor parameter auto-turning 1 确认安全回路都通、接地良好、无错接线。 Safety loop is connective and effective grounding. 2 吊起轿厢,将钢丝绳从曳引轮上取出,使曳引机

文档评论(0)

sh4125733 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档