- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
国外模具标准
ES-200 DIE DESIGN AND BUILD STANDARDS
GENERAL CONDITIONS
It is the vendor’s responsibility to read and understand these standards. 阅读并理解模具标准是模具供应商的责任
All Tools must comply with O.S.H.A. Federal Safety Standards and MIOSHA State Safety Standards.
All corrections to the tool necessary to meet approval are the responsibility of the vendor and to be made prior to delivery to EE.
It is the vendor’s responsibility to be aware of part print tolerances, critical characteristics, and important features that must be addressed in the design of the tool.
EE engineering must approve the strip, 50% and final design before tool build is started.
Part print revisions affecting the die build will be communicated to vendor as soon as is practical. Subsequent tool design changes must be reviewed and approved by EE engineering prior to implementation.
We rely on our vendors to follow Good Die Practices, keeping in mind that EE is a High Volume Production House, requiring high quality durable tools.
EE 工厂是一个高产量的生产厂家,所以模具需要用高质量的模具
The tool source will generate a Time Line immediately following the reward of the job or receipt of P.O. ; it shall be accurately updated and sent by 12:00 noon every Thursday.
All materials needed to build the tool, including purchased items, are the responsibility of the vendor to supply unless otherwise specified in writing by EE Manufacturing.
Dies are to be designed to feed per EE Manufacturing engineering specifications.
Dies must be capable of running at the cycle rate as specified by EE. In the request for quotation and/or purchase order.
Parallels are to be supplied to suit press. (Press specification will be furnished by EE Manufacturing.) Fork width opening will be determined during die design review.
One (1) complete set of replacements for purchased punches, pilots and buttons are to be shipped with die. Etch with EE job numbering system if possible. Perishable/Purchased Tooling as defined during Die Design review process. A Perishable
您可能关注的文档
最近下载
- 汉威 HS 7X系列数字式超声波探伤仪使用说明书.pdf VIP
- 中华民族共同体概论课件第二讲树立正确的中华民族历史观PPT.ppt VIP
- “电—能—碳”模型构建与碳排放预测:以江苏为例进行实证分析.docx VIP
- 《合同风险防控要点》课件.ppt VIP
- 【山东省】DB37T 3366-2018 涉路工程技术规范(高清).pdf VIP
- 北师大版八年级数学上册第三章位置与坐标测试题.pdf VIP
- 18DX009 数据中心工程设计与安装.docx VIP
- 10KV配电系统的电流互感器2CT、3CT的比较.pdf VIP
- GB50790-2013(2019年版):±800kV直流架空输电线路设计规范(2019年版).pdf VIP
- 《概率论与数理统计》第8章 回归分析.ppt VIP
文档评论(0)