- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
卷线安装工安全技术操作规程
卷线安装工安全技术操作规程
1 卷线安装工除遵守本规定外,应遵守《水电水利工程金属结构与机电设备安装安全技术规程》有关规定。Except for observing this regulations, a wire-winding erector shall also observe the specification of hydro power HSS and EM equipment erection safetytechnology.
2 定子绕组施工用吊架和平台,应安全可靠。定子内外应设防护栏杆和保护网。The lifting basket and platform for the construction of stator winding shall be stable and protection barrier and mesh shall be set up inside and outside of stator.
3 在定子下端头的作业人员,应戴安全帽,所用工具材料不得抛掷。Worker standing under stator shall wear a helmet and it is forbidden to throw passing a tool.
4 下线应有专人指挥,动作应协调一致。采用专用下线机下线,等线棒固定牢固后,方可松钩。There should be a special people to direct set out wire concurrently, and setting out wire should be conducted by special machine. Only after wire pole fixed up can the hook loosen.
5 打槽楔时,精力应集中,不得击伤线圈及铁芯。When punching a wedge, the operator shall be concentrated and shall not damage the winding and the core.
6 线棒端头及汇流环焊接前,应准备好防火措施,焊接作业应遵守焊接设备安全操作规程。Before welding bar connector and circuit ring, measures should be taken to protect from fire and the welding shall comply with the safety specification.
7 焊锡作业时,作业人员应戴防护眼镜、手套和脚套,严禁水滴入焊锡锅中。Operator shall wear protection goggles, gloves and feet cover and ensure not water dripping into soldering pot when carrying on soldering.
8 磁极开箱检查、吊运、装脱线圈工作,应有专人指挥。吊运或装、脱线圈时绑扎应牢固,经检查确认无误后,方可起吊。There should be a special people directing people opening boxes and checking, lifting, installation and loosing winding. The pole should be fixed up when conducted lifting, installation and loosing winding.
9 检查处理磁极线圈时,作业人员应穿戴防护用品。线圈就位时,应防止挤压伤人。The operator should wear PPE when checking and treating winding of pole and measures should be taken to protect winding from hurting people when it is positioned.
10 配制环氧复合物时,应戴手套、防护镜、防护衣和防护鞋。工作完后应洗手。People should wear gloves, goggles, protection clothes and shoes when matching epoxy compound. Washing hands after work.
11 喷漆作业周围不得有火源,场地应通风良好。喷漆作业每次延续时间不得超过15min,应轮换进行作业。There should be no fire when carry on