specification of a type steel pipe scaffold.docVIP

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
specification of a type steel pipe scaffold

specification of a type steel pipe scaffold 》 performance. 5, the small horizontal pole button up one rickety solid.May cause a body tumble down to harm a person, existing control measure BE:Press the 《the building construction buttons up a safe technical specification of a type steel pipe scaffold 》 performance. 6, operation the personnel didnt wear safety belt.May cause to sink into to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a type steel pipe scaffold 》 carries out. 7, the body pulled a crunode to once be apart from greatly and pulled a crunode rickety solid.May cause a body tumble down to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a type steel pipe scaffold 》 carries out. 8, the shelf scissors support to establish angle not appropriate, not agree with to match a request.May cause a body tumble down to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a type steel pipe scaffold 》 carries out. 9, the shelf scissors support to take to connect one to button up less piece.May cause a body tumble down to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a type steel pipe scaffold 》 carries out. 10, the body didnt adopt measure in the 25 Ms Ms-50ses.(the double signs a pole or narrows a high bar to be apart from or cent segment the lotus carry)May cause a body tumble down to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a type steel pipe scaffold 》 carries out. 11, the extremely high body unload the lotus steel wire rope angle not reasonable, the card son Be not by rule to establish.May cause a body tumble down to harm a person, existing control measure BE:《The building construction buttons up a safe technical specification of a t

文档评论(0)

sd44055 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档