- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
EMUs of CSR export to Malaysia中国产动车出口马来西亚
EMUs of CSR export to Malaysia中国产动车出口马来西亚 ?Technicians debug an electric multiple units in China South Locomotive and Rolling Stock Corporation Ltd. (CSR) Zhuzhou Electric Locomotive Co. in Zhuzhou, central Chinas Hunan Province, March 13, 2012. CSR announced that its high-end electric multiple units (EMUs) exported to Malaysia have officially started running in Kuala Lumpur on Thursday. The EMUs, or modern rail transport vehicles, are independently made by CSR Zhuzhou Electric Locomotive Co. Each set consists of six carriages, and can travel at a maximum speed of 140 km per hour. The maximum passenger load for each set can reach 1,200 persons. A total of 228 units made by the Chinese company were put into use in Kuala Lumpur. In 2010, CSR Zhuzhou Electric Locomotive Co. agreed on a 4-billion-yuan (591.9 million U.S. dollars, based on the exchange rate that time) deal with the Transport Ministry of Malaysia to supply rail vehicles, which are required to be delivered by May 2012. (Xinhua/Zhao Zhongzhi)
? A technician debugs an electric multiple units in China South Locomotive and Rolling Stock Corporation Ltd. (CSR) Zhuzhou Electric Locomotive Co. in Zhuzhou, central Chinas Hunan Province, March 13, 2012. CSR announced that its high-end electric multiple units (EMUs) exported to Malaysia have officially started running in Kuala Lumpur on Thursday. The EMUs, or modern rail transport vehicles, are independently made by CSR Zhuzhou Electric Locomotive Co. Each set consists of six carriages, and can travel at a maximum speed of 140 km per hour. The maximum passenger load for each set can reach 1,200 persons. A total of 228 units made by the Chinese company were put into use in Kuala Lumpur. In 2010, CSR Zhuzhou Electric Locomotive Co. agreed on a 4-billion-yuan (591.9 million U.S. dollars, based on the exchange rate that time) deal with the Transport Ministry of Malaysia to supply rail vehicles, which are required to be delivered by May 2012. (Xinhua/Zhao Zhongzhi)
您可能关注的文档
- 【创新设计】(山东专用)2014高考英语一轮复习 高频语法训练 附录5 动词时态和语态.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第10篇 第3讲 二项式定理限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第11篇 第1讲 随机抽样限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第12篇 第1讲 离散型随机变量及其分布列限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第13篇 第3讲 直接证明与间接证明限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第14篇 第3讲 不等式和绝对值不等式限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第13篇 第4讲 数学归纳法限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第12篇 第3讲 离散型随机变量的均值与方差限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 易失分点清零9 解析几何限时训练 理.doc
- 【创新设计】(浙江专用)2014届高考数学总复习 第11篇 第4讲 古典概型限时训练 理.doc
文档评论(0)