- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Azusqm期法律法规 预测试卷四
秋风清,秋月明,落叶聚还散,寒鸦栖复惊。
the oil level to the normal oil level. 2 for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and construction units to deliver the design, and drawing the third. Combined the engineering field to find fault, adding omitted items. Because the unit used computer DCS control and adds a great deal of control and signal cables. So you should carefully review, checks for missing physical cable, ready for construction and to verify cable length, specifications, familiar with the cable channel and the device location and bracket cable bracket on the section number. At the time of preparation of the inventory of cable, first of all, the professional carefully study electrical schematics, in accordance with the principle of accounting the cable path cable volume, the number of cores used, total volume and design inventory check cable to cable with and without omission, laying of the cable in order to ensure the process does not put a cable one cable. Finally, at the time of inventory, prepared to take the same path the cables together. Inventory preparation is completed, later in each enclosure affixed on both sides of each side of the cable you want to lay accurately verify cable lengths and set aside. Bridge should be combined, correcting errors, avoid straight, no cable bridge scaffolding used in the construction, not allowed to use electricity fire cutting, fix cable tray, cable tray is not allowed as a welding ground connection or cable tray cannot be used for other processes
the oil level to the normal oil level. 2 for the secondary prevention of the leakage of cooling water pipe fittings, valve parts before installation to check ... 4.2 measures to eliminate quality defects of cables cable laying in front of the cable construction, design, supervision and
您可能关注的文档
- 8月第一周热点事新闻.doc
- 9-TN_SP7_C1 NB接口和协议-9.doc
- 919临涣粉磨建设工程项目风险管理研究论文定稿3查重修改后3.doc
- 9001800Hz TDMA数字蜂窝移动通信网扩展短消息实体到短消息中心接口协议规范.doc
- 9011_902_9013_9014_8050_8550三极管的参数及区别.doc
- 9100G可删的系统程序列表(从A到Z).doc
- 91金融首家线体验店开业 金融生态O2O战略闭环初成.docx
- 91手机助手Fr iPhone(苹果)详细使用教程.docx
- 973 201CB215300-G草本能源植物培育及化学催化制备先进液体燃料的基础研究.doc
- 9013 - PN型三极管的功能解析.doc
文档评论(0)